Unfortunately it has far less capacity, goes a very long way around and doesn't get very near Mossend Yard, making it not particularly useful for freight.There is a Beattock avoiding line with much more favourable gradients: the Glasgow & South Western main line.
What would the rough time saving if these two were bypassed?
I understand Class 88's regularly do the Daventry to Mossend intermodals. How well does an electric locomotives like the 88 (5,400hp) do compared to Class 66 (3000hp) going up Shap and Beattock?A freight on average looses about 15 minutes crawling up,
What would the rough time saving if these two were bypassed?
I know this can't be quantified but surely there would be further time benefits from freeing up capacity, particularly through generalised journey time if there's less need for flighting?That depends how it is bypassed. But potentially about 5 minutes each, best case.
The London & North Western obtained powers in 1898 to build an 8¾ mile deviation between Tebay and Shap station. This would have had a one-mile tunnel, and it would have resulted in a gradient of 1:135 rather than 1:75. The existing line in that section was to be abandoned. Nothing was done, and given that the compulsory purchase powers expired after three years, one would assume the act just became worthless unless the company extended the powers. (I've had a quick look at the act, and it seems to have an odd feature in that I couldn't find a section requiring completion of the works within a given time.)Was there ever a proposal to by-pass Shap with a tunnel? And Beattock?
Also isn't electrified meaning diesel locos would need to use itUnfortunately it has far less capacity, goes a very long way around and doesn't get very near Mossend Yard, making it not particularly useful for freight.
For the time being.Also isn't electrified meaning diesel locos would need to use it
Near Shap Summit itself, the M6 diverges away from the railway line, so I don't think that would be an issue.Is there any map of the 1898 deviation available so we could see where it was planned to go? Curious to see if it could be done now or does the M6 get in the way?


I know this can't be quantified but surely there would be further time benefits from freeing up capacity, particularly through generalised journey time if there's less need for flighting?
Oh yes I'm aware of that, I should've elaborated more on what I meant, sorry! And thanks for the answerJourney time and generalised journey time are different concepts, albeit related. However GJT improvements here would be limited only to those travelling exclusively north of Preston.

I understand Class 88's regularly do the Daventry to Mossend intermodals. How well does an electric locomotives like the 88 (5,400hp) do compared to Class 66 (3000hp) going up Shap and Beattock?
Out of interest, if you work out roughly what tractive effort is needed to lift a 1600 tonne (gross) train up Shap or Beattock against gravity alone - there is an online calculator here - and relate it to the tractive effort versus speed graphs in post #243, the balancing speed for a 93 on electric is around 40 to 45 mph. (The calculated required TE is about 220 kN, but that takes no account of other rolling resistances, aerodynamic drag, headwinds etc.)
I haven't seen a map, but there will be an "overview" map with the deposited QS plans, both in the county record office and in the House of Lords record office. These maps were usually done on 1" OS. The scheme got quite a bit of newspaper coverage at the time, and one of the papers did say that the new alignment was not actually going to go very far from the old. The idea seems to have been to diverge to the west immediately north of Tebay station, cross under the existing line at Scout Green, and then re-join a short re-alignment of the existing line at Shap station.Is there any map of the 1898 deviation available so we could see where it was planned to go? Curious to see if it could be done now or does the M6 get in the way?
Can hard rock TBMs not bore through granite?TBMs wouldn’t be used for tunnel through granite, it would be blasted, by drilling a hole (actually a ring of holes, roughly around diameter of tunnel) and filling it with modern equivalent of dynamite.
What's the book? It looks interesting (and pretty substantial too).If it is only a mile long tunnel it would have to be further west, by the Birk Beck, passing close to Shap Wells hotel and emerging near the quarry works ... nearer to water courses when storm Desmond gave this area (gauge at Wet Sleddale) 13 inches of rain in 24 hours may not be wise! Not the deviation mentioned above (post 13), but the attached is of interest.View attachment 120952
Sorry! The Kendal & Windermere Railway, Robert Western, Oakwood Press. ISBN 978 0 85361 721 1What's the book? It looks interesting (and pretty substantial too).
Surely the much cheaper solution - even if GBR bought then leased new electric locos to the FOCs for free - is to just put a lot more (electric) power on the trains?However I'd suggest the primary benefit of a Shap or Beattock Base tunnel would be dramatic reductions in the ruling gradient, allowing low power freight trains to get out of the way more rapidly.
Thanks — I'm going to have to get that!Sorry! The Kendal & Windermere Railway, Robert Western, Oakwood Press. ISBN 978 0 85361 721 1
That's the obvious first step. With the advent of the 6MW Class 99, the supply certainly needs beefing up to allow two or three of these flighted one after another, up these gradients. From openinframap, there are grid supply points at Shap and Beattock summits, fed by 132kV and 400kV substations so plenty of power available locally.Surely the much cheaper solution - even if GBR bought then leased new electric locos to the FOCs for free - is to just put a lot more (electric) power on the trains?