Nottingham59
Established Member
Looking at Google maps, it seems to me that the southernmost platform (7) at Nottingham could be lengthened to accommodate 400m trains, without impacting on the London Road bridge. But it would be a very tight fit. What do other people think? I measure it as 130m from the end of the platform to the bridge. Can anyone say how long is platform 7 now?
(Edit: this envisages straightening the track so it terminates at the bridge, rather than curving round to rejoin the through line)
(Edit: this envisages straightening the track so it terminates at the bridge, rather than curving round to rejoin the through line)
Last edited: