If it had passengers at night, I dont see why not, aside from maintenance. But I doubt there will be much call for it at 3 am.If it ever gets built of course..
Does it have the potential for 24 hour running, or have they not even thought that far ahead
If it had passengers at night, I dont see why not, aside from maintenance. But I doubt there will be much call for it at 3 am.
If it ever gets built of course..
Does it have the potential for 24 hour running, or have they not even thought that far ahead
If it had passengers at night, I dont see why not, aside from maintenance. But I doubt there will be much call for it at 3 am.
Yes - High Speed would get you to your destination too quickly!! The advantage of sleeping car trains is they run through the night and don't get in too early or set off at 3.00am. I think you could make a case for running sleepers on the line to free up freight capacity elsewhere.I dunno. There might well be demand for an hourly overnight service especially on Fridays and Saturdays...
It won't have sleepers, it will be slab trackYes - High Speed would get you to your destination too quickly!! The advantage of sleeping car trains is they run through the night and don't get in too early or set off at 3.00am. I think you could make a case for running sleepers on the line to free up freight capacity elsewhere.
If it had passengers at night, I dont see why not, aside from maintenance. But I doubt there will be much call for it at 3 am.
Nope, it will be slab, the amount of ballast that phase 1 would need would be eye watering and you would massively struggle to get the throughput of trains to deliver it as it wouldn't be bog standard stuff. It would need to be imported.I thought slab track was getting chopped in the desperate cost cutting?
0000 - 0500 white period I have heard.It won't have sleepers, it will be slab track
HS2 will have bi-directional signalling and crossovers, so it would be possible to run an infrequent service using single line working, but only when whatever maintenance was taking place didn't need both tracks.
Maybe not all night every night along the whole (eventual) system, but I could certainly see a demand for people in Birmingham wanting to attend events in London before getting a 45 minute train home early Saturday or Sunday morning.
Maybe not all night every night along the whole (eventual) system, but I could certainly see a demand for people in Birmingham wanting to attend events in London before getting a 45 minute train home early Saturday or Sunday morning.
So could I , and, to a much lesser extent, the other way around.
There are places on the night tube nearly as far from the West End as Birmingham would be on HS2.
0000 - 0500 white period I have heard.
The block will just follow the last train, I really don't see a lot of single line working happening.That's quite early given that (Saturdays aside) there's a 2300 to Manchester and 2330 to Brum, which while not *heaving* do carry a reasonable number of passengers.
That's quite early given that (Saturdays aside) there's a 2300 to Manchester and 2330 to Brum, which while not *heaving* do carry a reasonable number of passengers.
London – Crewe is planned to be 55 minutes on HS2 I believeI could imagine that, at HS2 speeds, a 2300 Euston departure could at least get to Crewe on HS2 (to join the WCML) before midnight - given the journey time to Birmingham is only 49 minutes or so.
I could imagine that, at HS2 speeds, a 2300 Euston departure could at least get to Crewe on HS2 (to join the WCML) before midnight - given the journey time to Birmingham is only 49 minutes or so.