Nicholas43
Member
According to post #42 in this thread
http://www.railforums.co.uk/showthread.php?t=28509&page=3
a 2+10 HST is possible. And, to judge from the Luxulyan incident, it isn't that difficult to play with the couplings.
So, at a moment (if there are any?) when FGW has a spare set, can they, in principle, add a carriage or two to a working expected to be over-crowded? Could a lengthened set keep more or less to time?
Or, in practice, are such operations just too difficult on the modern railway?
http://www.railforums.co.uk/showthread.php?t=28509&page=3
a 2+10 HST is possible. And, to judge from the Luxulyan incident, it isn't that difficult to play with the couplings.
So, at a moment (if there are any?) when FGW has a spare set, can they, in principle, add a carriage or two to a working expected to be over-crowded? Could a lengthened set keep more or less to time?
Or, in practice, are such operations just too difficult on the modern railway?