I don't disagree with that, perhaps with some charging points in the terminus platforms for topping up while loading. The stationary charging points could use conductor rails and shoes compatible with LUL's 4 rail system (as with Vivarail's fast charger concept), so power could also be drawn from the traction rails on the shared LUL owned sections of the Aylesbury route north of Harrow without erection of OHLE. I think there's also a good case to extend the 4-rail system south of Harrow to Neasden or Finchley Road. Primarily for staff safety, From Finchley Road onwards I would rather not have any ground level power in the tunnels, or in the station yard area of the terminus (apart from for the stationary charging points). In a notional whole fleet renewal, an inner suburban unit might be specified with 4-rail and OHLE pickup and a moderate battery capacity to operate Aylesbury and High Wycombe stoppers. For longer distance limited stop services to the Midlands and Oxford, AC electric or diesel units would be used (or bimode as appropriate to the extent of electrification), with sufficient battery storage on board to power all the way from the end of wiring or permitted diesel operation (say around Neasden), into and back out of Marylebone.