Spartacus
Established Member
- Joined
- 25 Aug 2009
- Messages
- 3,851
Moderator note: split from https://www.railforums.co.uk/threads/brush-wabtec-to-close.216716/
One upside might be that depending what closes there might be an opportunity to provide Loughborough with the 4th platform it's been missing. I think the current rail business is situated very much round the back, so that's probably unlikely.
One upside might be that depending what closes there might be an opportunity to provide Loughborough with the 4th platform it's been missing. I think the current rail business is situated very much round the back, so that's probably unlikely.
Last edited by a moderator: