poshbakerloo
Member
I do like the MK4s but they are getting on now. There have been trains built in 2 batches before, several years apart. Like the old Mersey Rail trains, built first in the 1930s and again in the 50s...
Not unless they were looped at, say, Retford.Could a similar approach be used on the ECML? E.g. 8 car cl 350s (2+2 seat) running a London - York stopper? Calling Stevenage, Peterborough, Grantham, Newark, Retford, Doncaster, York? And stop longer distance (e.g. Leeds, Newcastle or Edinburgh services) from stopping at those intermediate stations?
225 sets consist of 9 coaches and a DVT and this hasn't been reduced. I'm not sure what happened as a result of these incidents, I'd guess there is one set less and a few spare coaches.Thanks for the thoughts. Didn't the 225 sets get shortened by one car each after Hatfield and/or Great Heck?
I appreciate the IEP could eventually succeed the mk. 4s, but with most of my recent journeys on NXEC / EC being very crowded for substantial parts of the journey, and seemingly lots of life left in them yet, do Alstom still own the rights to the design, and are there are any technological hurdles to producing, for instance, a small batch that could add a single standard class carriage to each IC225 set?
When built there were 30 sets (of eight carriages), and East Coast still has 30 sets (of nine carriages). When InterCity ordered the Mk 4s it ordered 34 Restaurant Firsts, even though there were only to be 30 sets. This was because two sets were formed as Super Pullman sets with an extra FO and two RFMs (at the expense of a TSO). Formations were thus: -225 sets consist of 9 coaches and a DVT and this hasn't been reduced. I'm not sure what happened as a result of these incidents, I'd guess there is one set less and a few spare coaches.Thanks for the thoughts. Didn't the 225 sets get shortened by one car each after Hatfield and/or Great Heck?Not unless they were looped at, say, Retford.
Building new Mk4s will never happen due to crashworthiness standards - which is probably just as well as they hardly shone at Hatfield.
A bit harsh I think. Obviously any death is one too many, however, looking at railway crashes through history and bearing in mind this one was at a relatively high speed, I hardly think the Mk 4's can be said to have performed badly.
Indeed, at Hatfield the four people who unfortunately died were all in the RFM (Restuarant Buffet). This vehicle was the one that had its back broken when it hit one of the stanchions for the overhead wires.
The Mk 3 and Mk 4 designs have unfortunatley had several opportunities to demonstrate the strength of their integral design in accidents.
Indeed, at Hatfield the four people who unfortunately died were all in the RFM (Restuarant Buffet). This vehicle was the one that had its back broken when it hit one of the stanchions for the overhead wires.
The Mk 3 and Mk 4 designs have unfortunatley had several opportunities to demonstrate the strength of their integral design in accidents.
The reality is that Mk3s and 4s are not as crashworthy as more modern vehicles. Things have moved on since they were designed, so the idea of building more is hardly sensible.
However, I wouldn't say no to 8 or 12 car 350/1s being used for services to Doncaster under the EC flag but saying that why not extend the Kings Cross to Doncaster proposal to Leeds then use the 91s on the main Angle - Scottish route.
With that being said, how does Kings Cross - Stevenage - Peterborough then all stations to Leeds sound to you guys?
I know this has already been discussed in other threads but I will make the point again seeing as it has been raised.
An hourly service is really needed stopping at Peterborough, Grantham, Newark, Retford and Doncaster.
If this was a local line Grantham, Newark and Retford would almost certainly have a regular service with reasonable Day Return Fares for local shopping trips etc. As it is the two Nottinghamshire towns of Newark and Retford have gaps of up to 5 hours or more without trains between the two. Also there is the rediculously high price of £17 for a return between Newark and Doncaster, which in many parts of the country would be considered a locl journey costing no more than £10 or even considerably less.
Only what they have demonstrated is the failings of the designs.
Is that £17 before or after 10am Weekdays?
Very true. Unfortunately alot of people on this forum would rather die than have a pillar obstruct their view.
I don't wear a seatbelt when cycling., The risk of being knocked of your bike is by comparison with a rail crash, very high.
I would agree with your post in so far as new stock should be built to the most modern crash-worthy design available. Afterall, it's only natural that as engineering progresses, more modern trains should be safer than old ones.
However, I would take issue with the above line which fails to acknowledge that in all of the accidents involving Mk 3's and 4's, these vehicles have largely behaved as intended i.e. retained their integrity and resulted in vastly fewer casualties than more traditional builds of train and probably any other mode of transport travelling at similar speeds would have (and probably most slower modes as well).
They have demonstrated time and again that they were extremely well designed.
I have merely stated that the Mark 4's represented at the time they were built, a vast improvement in safety, and as such, can only be regarded as a resounding success in terms of design. The greatly reduced casualty figures in accidents involving Mk3's and Mk 4's over all previous types of train, and in all truth over most other forms of transport, are testament to this. I feel it is somewhat unfair on the designers of the time to suggest that they have instituted "design failings" merely because they did not have the benefit of an additional 20 - 30 years of experience and technological development.
Random vaguely related question - are 158/159s based on Mk.3 or Mk.4 bodys?
Random vaguely related question - are 158/159s based on Mk.3 or Mk.4 bodys?
How can a vehicle design which folded so badly at Hatfield be considered ' a resounding success'?
How can a vehicle design which folded so badly at Hatfield be considered ' a resounding success'?