Isn't that the role that Bletchley will now play?A station at Claydon with Javelins running to Oxford, Milton Keynes, Bedford and Cambridge on EWR would have been interesting.
A station at Claydon with Javelins running to Oxford, Milton Keynes, Bedford and Cambridge on EWR would have been interesting. Maybe also serving the nearby Cublington International Airport.
Isn't that the role that Bletchley will now play?
If it was to have been anything, it should have been this. Park & ride is debatable as a sustainable practice (Ebbsfleet is a sea of empty car park, but maybe underground/multi-story is better) - but beyond a railhead and interchange spot (Oxford to Manchester in how long?) - it would be a smart place to build housing, retail etc - establish one of these new 'not-new-towns' but green eco garden cities or whatever the hell the new name was. Roads would remain pretty rural for a time, and I'd expect it would be contentious overall. But great rail links.A station at Claydon with Javelins running to Oxford, Milton Keynes, Bedford and Cambridge on EWR would have been interesting. Maybe also serving the nearby Cublington International Airport.
Only by destroying the HS2 service, or building several miles of 4-track on HS2. Would be rather pricey.If it was to have been anything, it should have been this. Park & ride is debatable as a sustainable practice (Ebbsfleet is a sea of empty car park, but maybe underground/multi-story is better) - but beyond a railhead and interchange spot (Oxford to Manchester in how long?) - it would be a smart place to build housing, retail etc - establish one of these new 'not-new-towns' but green eco garden cities or whatever the hell the new name was. Roads would remain pretty rural for a time, and I'd expect it would be contentious overall. But great rail links.
Ah, the good old “whack a mole” HS2 Claydon park and ride or interchange.Only by destroying the HS2 service, or building several miles of 4-track on HS2. Would be rather pricey.
If you’re proposing Javelins, presumably this would also require re specifying EWR to a higher standard than the 90/100mph it’s currently being built to?A station at Claydon with Javelins running to Oxford, Milton Keynes, Bedford and Cambridge on EWR would have been interesting. Maybe also serving the nearby Cublington International Airport.
I wonder if the large distance between the two Birmingham stations will lead people capable of using rail to get to the current station to switch to driving to the new one.I expect large numbers of people using it to get from a railhead at Birmingham Interchange to Crossrail at Old Oak Common.
If you’re close enough to a rail station that has a service into Birmingham that you don’t need to drive to, it seems unlikely you’d choose to drive to one further away. HS2 between the two Birmingham stations isn’t going to save that much time that it would be a massive win overall.I wonder if the large distance between the two Birmingham stations will lead people capable of using rail to get to the current station to switch to driving to the new one.
The 'Javelin' non-stop service will be between Birmingham and London.
The 4 track is very common on all HSR for station loops. As for the HS2 service, I agree - BUT - that was with Leeds and I'm even skeptical about East Midlands Parkway.Only by destroying the HS2 service, or building several miles of 4-track on HS2. Would be rather pricey.
Bletchley to London on a 1Yxx London Midland service on the WCML is 38 minutes. It is nowhere near enough to HS2 for the time on that route via an theoretical interchange station being quicker.What’s the difference in time between Ashford/Ebbsfleet and London termini on the classic lines versus Javelin and what is the difference between say Bletchley and London on classic lines/HS2?
If you’re close enough to a rail station that has a service into Birmingham that you don’t need to drive to, it seems unlikely you’d choose to drive to one further away.
What do you mean by a Javelin train in this context?I can't see Javelin services on HS2, but I coikd see it happening on NPR. A Liverpool-Newcastle service will have 10 station calls and ideal for Javelin train.
Where would you envisage NPR services calling? My suggested stops would be:A Liverpool-Newcastle service will have 10 station calls
I think NPR trains will be high speed trains, with doors at thirds and a capacity of circa 500 passengers. Similar in style to a Javelin and capable of 140 mph, but it would need to be longer to achieve the required capacity.What do you mean by a Javelin train in this context?
I think the 10 stations would be: Liverpool Lime Street, Warrington, Manchester Airport, Manchester Piccadilly, Huddersfield, Leeds, York, Darlington, Durham, Newcastle.Where would you envisage NPR services calling? My suggested stops would be:
Lime St, LS Parkway, Warrington LL, Man Apt, Man Picc, Huddersfield, Leeds, York, Darlington, Durham, Newcastle. This is 9 intermediate stops.
I think there should be a regional express service, with 8tph between Liverpool and Leeds with this calling pattern. Perhaps 2tph continuing on to Newcastle and 2tph to Sunderland. Though I fear that the limitations of the Piccadilly throat will stymie even this modest ambition.
My assumption is that "NPR" would (eventually) give us a four-track railway all the way from Liverpool to Leeds. If it doesn't, then it will never generate the wider economic impacts that have been promised. But maybe a topic for another thread...the capacity beyond the NPR lines after Marsden to Leeds and Warrington to Liverpool.
I think NPR will need train stock similar in capability to TPE’s 802s and the Javelin - both capable of 225km/h (140mph) but NPR will run at 200km/h (125mph). Yes, half the journey between Liverpool & Leeds might be limited to 160kmh, but half of it won’t be as a good 60km will be on new NPR & HS2 track. Then there is the ECML. to contend with.NPR will be a somewhat lower-speed service than HS2 simply because stations are close enough together that 350km/h trains won't reach their maximum speeds anyway. It's possible some could run non-stop from Manchester to Leeds, but half of this will be limited to 160km/h or so because it's classic infrastructure.
Birmingham-Manchester-Leeds trains, assuming they operate at all, will need to be capable of 350km/h to avoid getting in the way of other trains on HS2 south of Manchester. This isn't such an issue for Liverpool trains because they share for a shorter distance, and that section also includes some speed restrictions as well as the Airport station. I suspect Birmingham-Manchester-Leeds will be standard HS2 stock, possibly with a longer dwell time due to the door spacing, rather than having yet another variant with 350km/h capability and a door spacing optimised for shorter dwell times.
My assumption is that "NPR" would (eventually) give us a four-track railway all the way from Liverpool to Leeds. If it doesn't, then it will never generate the wider economic impacts that have been promised. But maybe a topic for another thread...
That's showing absolutely no sign of happening unless you count some other parallel route as contributing some of the four.My assumption is that "NPR" would (eventually) give us a four-track railway all the way from Liverpool to Leeds. If it doesn't, then it will never generate the wider economic impacts that have been promised. But maybe a topic for another thread...
Yes, you are right. When the IRP stated "We are funding quick-win upgrades around Leeds station. On top of this, we will carry out enhancements at Leeds station as part of Northern Powerhouse Rail. We will undertake a study to understand the most optimal solution for Leeds station capacity." (para 3.65), I had assumed this would (could?) include four tracking from Dewsbury to Leeds. But it doesn't look that way, unfortunately.That's showing absolutely no sign of happening unless you count some other parallel route as contributing some of the four.
I'd say "station capacity" indicates it is looking at the station area rather then the line as far away as Dewsbury. We've already discussed several times on other threads that there is capacity to run 8TPH Manchester fasts plus a 30min interval stopping service on that section even with double track.Yes, you are right. When the IRP stated "We are funding quick-win upgrades around Leeds station. On top of this, we will carry out enhancements at Leeds station as part of Northern Powerhouse Rail. We will undertake a study to understand the most optimal solution for Leeds station capacity." (para 3.65), I had assumed this would (could?) include four tracking from Dewsbury to Leeds. But it doesn't look that way, unfortunately.