northwichcat
Veteran Member
One question that keeps coming up is what routes will see 185s after North TPE electrification with the 185s being very powerful.
However, with the 185 fleet being relatively small could they be re-engineered to work with 2 engines instead of 3 and then the spare engines being used for parts to keep them going instead of making a small number of spare parts when things go wrong with them?
However, with the 185 fleet being relatively small could they be re-engineered to work with 2 engines instead of 3 and then the spare engines being used for parts to keep them going instead of making a small number of spare parts when things go wrong with them?