Many thanks for this.
Through a forum I have been linked into an article on the railengineer.co.uk site. The article, dated April 2022, gives some information on the plans for the Newquay, Looe and Gunnislake lines.
Gunnislake line:
- the crossings at Okel Tor and Sandways will be changed from open crossings to AOCL (Automatic Open Crossing Controlled Locally): the road layouts at those locations (the crossings are next to road junctions) mean that barriers cannot be installed.
Newquay line:
- New passing loop for Goss Moor to facilitate an hourly service
- Reinstatement of the second platform at Newquay which will enable more through trains from beyond Par.
Looe line:
- conversion of the crossings at Lodge Farm and Terras from open crossings to ABCL.
The aricle, for anyone interested, can be found at
https://www.railengineer.co.uk/a-modular-approach-to-signalling-in-cornwall/ and gives a good amount of detail. No mention is made of what will happen to St. Blazey SB though which I guess will abolish with control passing, as with Lostwithiel, Par and Truro, to Exeter?
Dave