Kentish Paul
Member
I recall from other threads on this forum that the Cornish Main line can only support 1tph (passenger) in each direction. If we take Penzance to Plymouth as 80 miles and the journey time as 2 hours (allowing for an average number of stops), this leaves 1 train at the half way stage as the next leaves Penzance and the previous arrives at Plymouth. Not sure of the length of signal sections anymore but i would have thought more could be fitted in.
Maybe the other paths are filled by frieght and ECS moves. Am I right that the existing section breaks are St Earth, Truro, Burngullow, Par, Lostwithiel, Liskeard and Saltash.
As a 30 year resident of Penzance from 1959 having used Marazion and Chasewater stations (!) an update on the current situation would be greatly welcomed.
Thanks, Paul.
Maybe the other paths are filled by frieght and ECS moves. Am I right that the existing section breaks are St Earth, Truro, Burngullow, Par, Lostwithiel, Liskeard and Saltash.
As a 30 year resident of Penzance from 1959 having used Marazion and Chasewater stations (!) an update on the current situation would be greatly welcomed.
Thanks, Paul.