Yes, because if people don't use the train you may as well withdraw the service.
Not true for many of my suggestions.
Ok, let's go through this
- Marshlink: Yes there's space at Ashford and Hastings with the bay platforms
- Uckfield: Oxted bay platform is quite short and the layout is not conducive for terminating trains on the through platforms. If your plan is for a Curtailed Oxted-London bridge service that's 2 turnrounds per hour to fit around the existing 2/3tph East Grinstead service. Uckfield trains currently run at 230m, so if your solution is to limit train length where do all the rest of the passengers go? (Answer: in their cars).
- Amersham: Probably doable, but I'd be astonished if lack of all-day fast trains into London meant the net carbon shift was downwards as the entirety of the train patronage switch to their cars.
- Manchester Piccadilly and Birmingham have been covered before, in extensive depth. There's no way you'll run a self-contained service between Piccadilly and New Street.
- Putting lots of crossing moves at Lancaster will have a massive impact on WCML capacity as the junction margins are 4/5 mins depending on which moves your making and which overlaps you're blocking. Maybe the Barrow frequency is low enough to make it viable
- Preston bay platforms are between the fast lines, and it's only got 1 platform for each slow line. If you're splitting the services at Preston, even with platform sharing, you'll be blocking out one slow line or the other for a considerable portion of each hour
- Skipton doesn't have crossovers at the North end, so you'd need to shunt via the Leeds end in between the 8 moves per hour.
- Cambridge is already busy enough that they send trains through to Cambridge North to relieve pressure on the station.
- Stockport doesn't have south facing bays so you'd need to shunt across the fast lines (or terminate in the Up slow and use the shunt signal back from there). Additional crossing moves at Stockport or Heaton Norris Junction will have a big impact on the existing services.
- Wolverhampton is already full of Avanti services, and I think the north bay isn't signalled for passenger use
- Newcastle as I've mentioned is probably doable.
So, of your suggestions the only ones that could work are Marshlink, Amersham, Lancaster and Newcastle. That's assuming that splitting these services doesn't make everybody switch back to their cars because they now have much less convenient journeys. The ones that don't work are Uckfield, Manchester-Birmingham, Blackpool-Leeds, Skipton, Cambridge, Stockport and Wolverhampton.
A number of these could be resolved with additional crossovers or extra bays, but that's not a 'quick win' because any change to infrastructure involves changes to signalling and that requires lots of money to design, test, and block the line while you install them. Some of these would need infrastructure to the level that it'd be just as quick to electrify the line concerned.