Y Ddraig Coch
Established Member
Why have they started allocating 2 x 153s again when only a 150 will ‘fit’ at Dolgarrog?
You couldn’t make it up!
All the 153s I have seen in North Wales in recent months have been pairs.
Why have they started allocating 2 x 153s again when only a 150 will ‘fit’ at Dolgarrog?
You couldn’t make it up!
Why have they started allocating 2 x 153s again when only a 150 will ‘fit’ at Dolgarrog?
You couldn’t make it up!
Why have they started allocating 2 x 153s again when only a 150 will ‘fit’ at Dolgarrog?
You couldn’t make it up!
Also begs the question as to why when they rebuilt Dolgarrog they didn't either (a) build it really short and have it operated local door only, thus saving money, or (b) spend a little and make it 48m long so it could take a 2-car 197 (and therefore a pair of 153s) as it will get at some point if it doesn't end up floating down the Conwy again before they get chance.
Or is it perhaps the case that with 197s they will be operating the doors from a passenger door, and as these are at thirds they can just leave 4m hanging off the back and put the S board 4m off the end, but all passenger doors will be accommodated?
I think it's because Network Rail were just repairing the flood damage.Also begs the question as to why when they rebuilt Dolgarrog they didn't either (a) build it really short and have it operated local door only, thus saving money, or (b) spend a little and make it 48m long so it could take a 2-car 197 (and therefore a pair of 153s) as it will get at some point if it doesn't end up floating down the Conwy again before they get chance.
Or is it perhaps the case that with 197s they will be operating the doors from a passenger door, and as these are at thirds they can just leave 4m hanging off the back and put the S board 4m off the end, but all passenger doors will be accommodated?
I see that trains are currently still replaced by buses - is this still due to Covid? There doesn't seem to be any mention of it on the TFW site.
Thanks for clarifying that particular matter.I've been told that the money for the various flood repairs in recent years comes from a maintenance/repair budget. The reason they've only repaired and fitted new culverts and drainage to the track that's been washed out, and not taking the same action as a pre-emptive measure elsewhere on the line, is that it would be considered an "improvement" rather than maintenance, and would require a bid from a different pot of money.
Because it needs some 'Frank' and honest decisions about its future?This line should be renamed The Sinatra Line......

They Can't Take That (branch line) Away From Me?This line should be renamed The Sinatra Line......
Because it needs some 'Frank' and honest decisions about its future?![]()