Earlier today, a large vehicle fire engulfed the westbound carriageway of the A55 Conwy Tunnel. The road has been shut all day in both directions.
North Wales police deemed the fire under control later in the afternoon, yet stated that:
At the moment, the A55 is shut at Llanfairfechan to J.19 at Llandudno Junction.
The diversion is huge, going down the A470 to Betws-y-Coed, then joining the A5 through the Ogwen Valley and Bethesda, before rejoining the A55 at J.11 for Bangor.
The A470 and A5 are busy roads at the best of times, especially around Llanrwst, Betws and Bethesda, so closure for a long period of time could be very disruptive indeed. The A55 up to the tunnel should reopen soon enough, yet the alternative route through Conwy is hardly suitable for large volumes of traffic.
Would the Conwy Tunnel reopen just eastbound? Could the eastbound carriageway be split in direction?
== Doublepost prevention - post automatically merged: ==
An update on this:
The A55 is now fully reopen, INCLUDING the Conwy Tunnel in both directions. However, the tunnel is down to 1 lane for both carriageways.
Incredible to get it reopen that quickly, however yesterday was definitely a warning shot as to what the region would look like without the tunnel.
The current structure is from the 90s, and with no fire mitigation systems other than ventilation fans and a tannoy alarm system. I know the Tyne Tunnel in Newcastle is fitted with sprinkler and mist systems. Whilst that wouldn't have helped yesterday, and with the increasing number of EVs on the UK's roads, would provide a different risk, having some sort of fire suppression system in the tunnel is surely overdue?
North Wales police deemed the fire under control later in the afternoon, yet stated that:
Due to the scale of the incident and the need for ongoing safety assessments, the Conwy Tunnel remains closed in both directions and is expected to remain closed for a significant amount of time. Detailed inspections will need to be carried out to determine the extent of any damage before the tunnel can be safely reopened
At the moment, the A55 is shut at Llanfairfechan to J.19 at Llandudno Junction.
The diversion is huge, going down the A470 to Betws-y-Coed, then joining the A5 through the Ogwen Valley and Bethesda, before rejoining the A55 at J.11 for Bangor.
The A470 and A5 are busy roads at the best of times, especially around Llanrwst, Betws and Bethesda, so closure for a long period of time could be very disruptive indeed. The A55 up to the tunnel should reopen soon enough, yet the alternative route through Conwy is hardly suitable for large volumes of traffic.
Would the Conwy Tunnel reopen just eastbound? Could the eastbound carriageway be split in direction?
== Doublepost prevention - post automatically merged: ==
An update on this:
The A55 is now fully reopen, INCLUDING the Conwy Tunnel in both directions. However, the tunnel is down to 1 lane for both carriageways.
Incredible to get it reopen that quickly, however yesterday was definitely a warning shot as to what the region would look like without the tunnel.
The current structure is from the 90s, and with no fire mitigation systems other than ventilation fans and a tannoy alarm system. I know the Tyne Tunnel in Newcastle is fitted with sprinkler and mist systems. Whilst that wouldn't have helped yesterday, and with the increasing number of EVs on the UK's roads, would provide a different risk, having some sort of fire suppression system in the tunnel is surely overdue?