I thought part of the route to southapmton couldn't be electrified
read it in spetember modern railways.
The SWML to Bournemouth was electrified in 1967; the electrification was extended to Weymouth in 1988.
Converting 3rd rail lines to 25kv AC would be very disruptive given that lengthy track possessions would initially be required. However, NR's proposed 'mobile wiring factory' should decrease possession times.
Such disruption would be aggravated by, in some cases, a lack of diversionary routes, meaning that replacement buses would need to operate. When the SWML from Woking to Bournemouth was electrified in 1967, the Mid Hants railway from Winchester to Alton was used as a diversionary route. However, it closed in 1973, and although the Mid Hants Railway runs trains from Alresford to Alton, extending the line to Winchester would be very difficult, if not impossible, as several housing estates encroach on the trackbed and the M3 bisects the trackbed. Additionally, a compulsory purchase order would be required to operate NR trains to Alton, and I can imagine the MHR fighting it, since such an order would undo about 30 years of hard work.
The other problem with electrification of the SWML is gauge clearances inside Popham, Wallers Ash, and Southampton Tunnels. The recent W9 (or 10?) gauge enhancements should mitigate this but clearances to install OHL, and run higher trains (an important consideration if double deck trains are to be introduced.) might not be enough. So this would require yet more disruptive gauge clearance work.
Therefore, to minimise disruption, Redbridge Junction to Salisbury and Basingstoke via the Laverstock Loop should be electrified at 25kv AC. This would allow SWML services to be diverted while conversion work on the SWML takes place. Electrification of the above lines would not be as disruptive due to the lower traffic flows. If Romsey - Eastleigh were electrified, then Salisbury 'Circular' services to Romsey could go to EMU operation (probably with 450s modified to run on 3rd rail and OHL), allowing 158s to be cascaded elsewhere, possibly to lengthen West of England line trains to Exeter St Davids pending electrification. Electrifying Basingstoke - Salisbury would allow Waterloo - Salisbury stopping services to be turned over to EMU operation.
Finally, to avoid having to reverse all trains at Southampton Central, I suggest that the 'Redbridge chord', proposed by the LSWR and linking the Salisbury and Bournemouth lines, should be built. Building the chord would require the reconstruction of the bridge carrying the A35, although given the strategic value of the chord, the reconstruction of the bridge could well be justified in those circumstances.