Anyone able to satisfy my curiosity as to whether a) Controllers in the main typically hope that an event resulting in major disruption will not occur on their "patch" during their shift or b) Controllers in the main actually welcome the challenges which unforeseen disruption brings and almost long for something to happen during their hours of duty?
Depends what mood the controller is in!
A) Even if disruption is not on their “patch”, rail disruption being what it is, it may well spread to other routes as many are not completely isolated. In addition, they may be providing assistance (e.g. logging, liaising with resources, picking up calls, note taking) for their colleague if they have capacity to do so.
I would say that if very little happens and it happens to be 12h shift as an example, the shift can really drag. So some sort of residual / minor level of disruption might be preferred which can take up a few hours and feel like a job well done. Ultimately if it was a good service all day, every day you’d hardly need controllers at all!
B) To an extent yes. It’s a rather specialist job which needs a particular mindset and there lots of railway employees who could never do the role, some of whom think they could and those who have seen it in action and know they couldn’t!
It depends on the factors of any given disruption obviously, and how collaborative the various people you need to liaise with are (other controllers, fleet, drivers, station teams, control management) as to how it’s going to go. This links into my answers in section A - you don’t want an all day job, throwing the schedule into complete chaos, crew and fleet totally displaced and end up passing a complete mess to your relief to try and put back together.
Whilst it may be a role that “you don’t take anything home with you”, if it’s been a particularly bad or high-pressured incident, that can sit with you for hours or replaying the events in your mind and it might be natural for some to be able to disengage immediately.
Control jobs seem to be seen as a “dark art” to many, but ultimately it’s about coordinating and dealing with multiple pieces of information from different sources, trying to deliver a Plan A (and B and C…) and communicating as best possible with all involved in some extremely high-pressure situations. If you’re a railway employee speak to your manager about getting a visit to your company’s ROC / control centre to get an idea of it from those that do it.