Construction progress: TPE 350/4

Status
Not open for further replies.

ianhr

Member
Joined
17 Sep 2013
Messages
534
350405 may have had an even worse day than sister 404 did yesterday.



I boarded at Preston and noted that the train had many expectant passengers for EDB, did not have any A/B/C/D window stickers, nor the electronic interior displays working, and looked spotless in and out.

It fell to the same unfortunate Conductor who was on yesterdays delayed working, and whom takes the train over at Preston, to inform the passengers on board that Carlisle was were the train would terminate and they would have a 40 minute wait before joining the next TPE service for Edinburgh.

What I don't know is whether 405 was defective at Oxford Road and repaired, or whether 405 was a swap for another defective unit. Was this 405s first day in public service?

So does anyone know what exactly was wrong with it? If when it had reached Preston it was fit to run to Carlisle why could it not continue to Edinburgh?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
The internal PIDS dont display all the time, they seem to only scroll information just before and just after leaving a station and are blank the rest of the Journey.
 

harz99

Member
Joined
14 Jul 2009
Messages
913
So does anyone know what exactly was wrong with it? If when it had reached Preston it was fit to run to Carlisle why could it not continue to Edinburgh?

Presumably because it was around 80' down and would still have been around an hour down returning from EDB. I understand the run back from CAR to MIA was uneventful and near enough to time.

It is a shame that there is no crossover and third platform at Lockerbie that could berth a late running train under these circumstances, providing of course that crew diagrams were suitable. As it is the unit was shunted and sat at CAR for around 1.75 hours.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Any idea what diagrams the Class 350/4s work at the weekend?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
They don't.

Maybe the previous posters question should have been any idea what diagrams the Class 350/4s work at the weekend from 15 February when the current West Coast engineering blocks finish. If none, when are they scheduled to start picking up weekend work?
 

andyb2706

Member
Joined
21 Jan 2013
Messages
747
Location
Manchester
On passing Ardwick this on the train I noticed a load of barrier wagong with 350406 sandwiched in between. Unless my eyes decieved me.
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,488
Location
Cheshire
Have TPE made a decision on a livery yet, given that they've now got 7 of the 10 units in their possesion?
 

joeykins82

Member
Joined
24 Jul 2012
Messages
601
Location
London
I suspect that TPE's decision on livery will follow DfT's decision on the future franchise holder; no point paying for something that's maybe changing hands in the relatively near future
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Have TPE made a decision on a livery yet, given that they've now got 7 of the 10 units in their possesion?

They only have 5. 406/407 need to be commissioned as until they are formally accepted into TPE fleet, so until then are Siemens units. Even tho its TPE doing the testing.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
Soon to be 7 we are doing well. Looking forward to the improvements across TPE North once they are done.
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
Soon to be 7 we are doing well. Looking forward to the improvements across TPE North once they are done.

Knowing TPE they won't be in too much of a hurry to provide more seats on their scandalously overcrowded trains. I assume they will need more conductors to man the 2x3-car and 2x2car diagrams, if they ever materialise!
 

BurtonM

Member
Joined
3 Feb 2014
Messages
975
Location
Manchester
In reference to the previous page, another potential reason for old/non-standard logo use in TPE is the fact that Keolis have a stake in the business, and the 'i' of Pennine is in fact the swooshy i from the Keolis logo. You'd have to acknowledge Keolis somewhere else and that'd just clutter things up.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Knowing TPE they won't be in too much of a hurry to provide more seats on their scandalously overcrowded trains. I assume they will need more conductors to man the 2x3-car and 2x2car diagrams, if they ever materialise!

You do realise TPE wanted more carriages but wasn't allowed too?
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
Knowing TPE they won't be in too much of a hurry to provide more seats on their scandalously overcrowded trains. I assume they will need more conductors to man the 2x3-car and 2x2car diagrams, if they ever materialise!

Nope same as current 2x3 car where 1 guard can operate..... Of course if you was to just be pointlessly rude about TPE then go ahead. The additional diagrams are already in place for May 2014.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
You do realise TPE wanted more carriages but wasn't allowed too?


No they didn't, TPE and every other toc love overcrowding so definitely their fault. Everyone knows that tocs like to short form trains whenever possible as well!
 

Sapphire Blue

Member
Joined
17 May 2010
Messages
453
. . . and everyone knows that TPE management keeps lots of spare units hidden away whilst they giggle at pax squeezed in between Leeds and Manchester.
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
. . . and everyone knows that TPE management keeps lots of spare units hidden away whilst they giggle at pax squeezed in between Leeds and Manchester.

I sometimes wonder whether their staff ever say anything to the TPE management, because the overcrowding often makes it difficult for the train crews to do their job properly. There are many trains on which it is impossible for the conductor/guards to sell or check tickets, or for the catering trolley to circulate, because it is physically so difficult to move through the train. Station dwell times are increased due to the mob of passengers around the doors. This is exacerbated if a train runs a few minutes late because passengers are already pouring onto the platforms at Leeds, Huddersfield & Manchester expecting the following train. I doubt that some of these trains could be evacuated safely in the event of an emergency. We have discussed TPE problems many times on this and other threads. My personal view is that what is needed is LONGER trains so that passengers can distribute themselves along the platforms and move about inside the train, not even more frequent very short trains. TPE is not a tramway. In their defence I always find the crews cheerful, knowledgeable and professional but somehow I am left with the feeling that the management care very little about passenger comfort.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
I sometimes wonder whether their staff ever say anything to the TPE management, because the overcrowding often makes it difficult for the train crews to do their job properly. There are many trains on which it is impossible for the conductor/guards to sell or check tickets, or for the catering trolley to circulate, because it is physically so difficult to move through the train. Station dwell times are increased due to the mob of passengers around the doors. This is exacerbated if a train runs a few minutes late because passengers are already pouring onto the platforms at Leeds, Huddersfield & Manchester expecting the following train. I doubt that some of these trains could be evacuated safely in the event of an emergency. We have discussed TPE problems many times on this and other threads. My personal view is that what is needed is LONGER trains so that passengers can distribute themselves along the platforms and move about inside the train, not even more frequent very short trains. TPE is not a tramway. In their defence I always find the crews cheerful, knowledgeable and professional but somehow I am left with the feeling that the management care very little about passenger comfort.

Everyone in the railway industry knows about the overcrowding on some routes so the train staff telling upper management about the problems wouldn't help a great deal. To solve these capacity issues it isn't possible just to order another set of DMUs and it's not possible within the franchise structure to remove services from less busy sections to relieve busy ones. The TPX routes are being electrified and that's by far the best way of solving the problems even though it will take many years. When you have electrified lines, it's really much easier than diesels just to tag on another order of whatever Siemens or Bombardier (or soon Hitachi) are building at the moment, and the trains would have a full life of revenue service ahead of them so the ROSCOs would be more than willing to finance them.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,237
. . . and everyone knows that TPE management keeps lots of spare units hidden away whilst they giggle at pax squeezed in between Leeds and Manchester.

But even now few people know that every post-privatisation order for EMUs included a 5% extra add-on that was never publicised, but transferred directly to the 'strategic reserve'. Not even Platform 5 list these units... :D
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
And theres always the Strategic Steam Reserve, hidden away in the tunnels in case of nuclear war :P
 

Philip

On Moderation
Joined
27 May 2007
Messages
3,734
Location
Manchester
I'm guessing the following two diagrams will be worked by 350s from Monday:

(05:51 Ardwick - Lancaster ECS) 07:23 Lancaster - Man Airport, 09:00 Man Airport - Glasgow Central, 13:09 Glasgow - Man Airport, 17:00 Man Airport - Glasgow

(ECS Ardwick - Man Airport) 07:00 Man Airport - Glasgow, 11:09 Glasgow - Man Airport, 15:00 Man Airport - Oxenholme, 17:31 Oxenholme - Man Airport, (Man Airport - Ardwick)
 

richardio123

Member
Joined
20 Nov 2012
Messages
105
Location
Fareham
I'm guessing the following two diagrams will be worked by 350s from Monday:

(05:51 Ardwick - Lancaster ECS) 07:23 Lancaster - Man Airport, 09:00 Man Airport - Glasgow Central, 13:09 Glasgow - Man Airport, 17:00 Man Airport - Glasgow

(ECS Ardwick - Man Airport) 07:00 Man Airport - Glasgow, 11:09 Glasgow - Man Airport, 15:00 Man Airport - Oxenholme, 17:31 Oxenholme - Man Airport, (Man Airport - Ardwick)

Someone posted this days ago

0558 MIA - EDB & 1008 EDB - MIA 1 x 350 MTWFO, 1 x 185 ThO
0812 EDB - MIA 1 x 350 FSX, 2 x 350 FO
0900 MIA - GLC & 1309 GLC - MIA 1 x 350 MTWO, 2 x 350 ThO, 1 x 185 FO
1200 MIA - EDB & 1612 EDB - MIA 1 x 350 FSX, 2 x 350 FO
1400 MIA - EDB & 1812 EDB - MAN/MIA 1 x 350 MTWFO, 1 x 185 ThO
1700 MIA - GLC 1 x 350 MTWO, 2 x 350 ThO, 1 x 185 FO
2000 MIA - EDB 1 x 185 FSX, 2 x 350 FO

:)
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Signs up saying the Lancaster service (5:15 Man Pic) will no longer call at Bolton and Chorley from next week so that looks like a service switching to election traction.
Replacement Northern service will start from Manchester Oxford Road at a similar time for Bolton line users.
 