Construction progress: TPE 350/4

Status
Not open for further replies.

Solent&Wessex

Established Member
Joined
9 Jul 2009
Messages
2,745
Don't suppose you have any inking of what services the 350/4s will be on bearing in mind train crew training and all that etc...

Would I be wrong in thinking that for starters, a 4 car 350/1 will allow a 6 car 185 to be used elsewhere then once all the 350/4s are available will TPE be running them as 8 car 350/4s on the Scotlands?

Also another quick query with the 350/3s AND 350/4s, will they be 110mph capable from the get go?

The first *booked* passenger working is on 30th December.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,898
Location
Mold, Clwyd
Would I be wrong in thinking that for starters, a 4 car 350/1 will allow a 6 car 185 to be used elsewhere then once all the 350/4s are available will TPE be running them as 8 car 350/4s on the Scotlands?
Also another quick query with the 350/3s AND 350/4s, will they be 110mph capable from the get go?

Yes, but the TPE ones will only be timetabled for 100mph initially, as they will interwork with 185s on the Scottish services until they are all delivered.
Cascades will only happen after the electric service is bedded in.
The only commitment is to use 4(?) extra 185s for the new Liverpool-Newcastle service in May (the Airport-Newcastle being cut back to York).
 

Solent&Wessex

Established Member
Joined
9 Jul 2009
Messages
2,745
TPE have quoted a number of additional seats they will provide per day so I'm not sure if that includes extra capacity on other services or not.

There looks to be significant extra capacity on the North route, especially the Hull route. All the Hull services look to be 185s or 170s in multiple, with some 6 car workings of both classes at busy times. Think there is only 1 round trip of a single 170 and that is on the quietest off peak trains. Stopping pattern all seems to change to, so all looks very radical from next May!
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
There looks to be significant extra capacity on the North route, especially the Hull route. All the Hull services look to be 185s or 170s in multiple, with some 6 car workings of both classes at busy times. Think there is only 1 round trip of a single 170 and that is on the quietest off peak trains. Stopping pattern all seems to change to, so all looks very radical from next May!

What happens to 170s on south route? If you know anyway...
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
(going wildly off topic) it would be quite interesting the possibilities, not just at TPE, if it was easy and financially viable to convert Class 170 driving cars into intermediates.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
What happens to 170s on south route? If you know anyway...

The TPE track access applications for May 2014 stated Manchester Airport to York, Manchester Piccadilly to Hull and South TPE would see both 185s and 170s, Scottish services would see 350s and 185s and the other routes would be exclusively 185s.
--- old post above --- --- new post below ---
6 car 170s? That'll be even more people getting free rides then.

On Manchester-Hull I think a free ride would be difficult by avoiding an on board inspection except possibly Selby to Hull. Huddersfield and Leeds have automated barriers while there's usually manual checks at Piccadilly on the platforms the Hull services use.

A 6 car 170 would make a trolley service very difficult on Manchester-Hull given the trolley is only available between Manchester and Leeds and there's only one intermediate calling point.
 
Last edited by a moderator:

Solent&Wessex

Established Member
Joined
9 Jul 2009
Messages
2,745
What happens to 170s on south route? If you know anyway...

Sounds like the overnight Sheffield - Airport service is a single 170. It attaches to another at some point to make a 4 car and there is another 4 car diagram. Rest are 185s. So during the day there looks to be 2 diagrams booked for a 4 car 170 with the rest being 185s.

All could be changed I suppose, but that is what I've seen.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,146
Location
Bolton
The TPE track access applications for May 2014 stated Manchester Airport to York, Manchester Piccadilly to Hull and South TPE would see both 185s and 170s, Scottish services would see 350s and 185s and the other routes would be exclusively 185s.
--- old post above --- --- new post below ---


On Manchester-Hull I think a free ride would be difficult by avoiding an on board inspection except possibly Selby to Hull. Huddersfield and Leeds have automated barriers while there's usually manual checks at Piccadilly on the platforms the Hull services use.

A 6 car 170 would make a trolley service very difficult on Manchester-Hull given the trolley is only available between Manchester and Leeds and there's only one intermediate calling point.

Huddersfield's are very often open, the checks at Piccadilly aren't always there and are often fallible, and don't forget about Stalybridge and Dewsbury (subject to future odd stopping pattern ;). Selby to Hull indeed sounds the most likely - and don't go forgetting Brough!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
don't go forgetting Brough!

Brough's not important. :) I recall it was to be removed as a TPE calling point when the TPE franchise started but when John Prescott said he was completely against that it remained as a calling point.

The last time I travelled to Hull the only people to board at Brough were a group of drunk middle aged women and it wasn't even midday!
 
Last edited by a moderator:

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
New Rail issue states that the last 7 350/4 will be delivered roughly fortnightly in the new year with them introduced in batches in February, April and May.

350401 will spend three weeks testing, play with some 350/1 & /2 as well as run at 110mph.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,492
Location
Yorkshire
(going wildly off topic) it would be quite interesting the possibilities, not just at TPE, if it was easy and financially viable to convert Class 170 driving cars into intermediates.

Due to the lack of corridor connections, I'd imagine incredibly difficult
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Due to the lack of corridor connections, I'd imagine incredibly difficult
But the isn't Turbostar/Electrostar platform modular? If so, how hard would it be to swap the cab for a inner-end or a class 172/377-style corridor-fitted cab?
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
If the latest rumours that Hull is about to be approved for electrification are correct then presumably TPE will eventually have little need for the 170s. All the Standedge route trains can thankfully be worked by electric stock and the 185s used for the Hope Valley, and Scarborough and Middlesborough branches.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
If the latest rumours that Hull is about to be approved for electrification are correct then presumably TPE will eventually have little need for the 170s. All the Standedge route trains can thankfully be worked by electric stock and the 185s used for the Hope Valley, and Scarborough and Middlesborough branches.

One of the benefits of Hull electrification is operational with only one fleet for TPE, and better inter-working available. I would if electrification occurs like to see the Selby Stopper extended.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
If the latest rumours that Hull is about to be approved for electrification are correct then presumably TPE will eventually have little need for the 170s. All the Standedge route trains can thankfully be worked by electric stock and the 185s used for the Hope Valley, and Scarborough and Middlesborough branches.

At the present the plan is for Middlesbrough and Scarborough to lose their Manchester services. Scarborough-York is likely to be tagged on to York-Blackpool while nothing has been said about Middlesbrough so I'd assume it'd be a York to Middlesbrough service.
 

Eagle

Established Member
Joined
20 Feb 2011
Messages
7,106
Location
Leamingrad / Blanfrancisco
One thing I have seen suggested (never officially though) is for TPE and XC to swap one path north of Northallerton, so that TPE have 2tph to Newcastle and XC run Reading to Middlesbrough.

Not sure how popular that would be though.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
One thing I have seen suggested (never officially though) is for TPE and XC to swap one path north of Northallerton, so that TPE have 2tph to Newcastle and XC run Reading to Middlesbrough.

Not sure how popular that would be though.

I am not sure either, i think that is the logical way to go but many disagree.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,389
Location
A typical commuter-belt part of north-west England
One thing I have seen suggested (never officially though) is for TPE and XC to swap one path north of Northallerton, so that TPE have 2tph to Newcastle and XC run Reading to Middlesbrough.

Not sure how popular that would be though.

It definitely would be with me, as I have nailed my First TPE colours to the Durham mast since I heard the bad news regarding a certain route.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
One thing I have seen suggested (never officially though) is for TPE and XC to swap one path north of Northallerton, so that TPE have 2tph to Newcastle and XC run Reading to Middlesbrough.

Not sure how popular that would be though.

I suggested that a while back. However, looking at what Nexus have said recently they are seeing the 2nd Newcastle-Liverpool as an additional service for Newcastle opposed to replacement service.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
One thing I have seen suggested (never officially though) is for TPE and XC to swap one path north of Northallerton, so that TPE have 2tph to Newcastle and XC run Reading to Middlesbrough.

Not sure how popular that would be though.

With no hope of the XC service from Southampton/Reading to Newcastle being wholly under the wires any time soon, and little point in two XC services running York - Newcastle within a few minutes of each other an hour, I wouldn't complain if this were to be the case.

But, looking at other threads, Middlesbrough - York may be served by an extension of the current London - York "stoppers" when the ECML franchise get bi-mode IEPs.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
I suggested that a while back. However, looking at what Nexus have said recently they are seeing the 2nd Newcastle-Liverpool as an additional service for Newcastle opposed to replacement service.

I think it might just be wise to electrify to Middlesbrough to be honest, (CP6) extend one of the Airport - York stoppers and also help the intermodal market which is slowly picking up in teeside.
--- old post above --- --- new post below ---
But, looking at other threads, Middlesbrough - York may be served by an extension of the current London - York "stoppers" when the ECML franchise get bi-mode IEPs.

That is the most advantageous intermediate step until electrification in my eyes.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I think it might just be wise to electrify to Middlesbrough to be honest, (CP6) extend one of the Airport - York stoppers and also help the intermodal market which is slowly picking up in teeside

The "issue" I have with Middlesbrough is that there's no scope of wiring the Durham Coast line until the Sunderland - Newcastle issue is resolved with new dual voltage "trams"...

...there's no scope of electrification to Whitby or Bishop Auckland...

...so would you keep the current half hourly Redcar - Darlington service DMU run (to maintain a critical mass of DMUs on Teesside), considering it wouldn't need much electrification?

(but we are going wildly off topic here, especially when there's an "improvements in north east England" thread)
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
The "issue" I have with Middlesbrough is that there's no scope of wiring the Durham Coast line until the Sunderland - Newcastle issue is resolved with new dual voltage "trams"...

...there's no scope of electrification to Whitby or Bishop Auckland...

...so would you keep the current half hourly Redcar - Darlington service DMU run (to maintain a critical mass of DMUs on Teesside), considering it wouldn't need much electrification?

(but we are going wildly off topic here, especially when there's an "improvements in north east England" thread)

Hmm, will have a think and comment on the other thread.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Any idea when 350401 will be put into FTPE colours?

Depends on if they can make a business case on the 10-20k cost PER unit.

Tenders are in but nothings been said officially bar the first one may run around unbranded.
 