Does anyone know if any of the many railway magazines have featured articles on the line to consett, featuring the class 37s with iron ore during the 70s, until it’s closure in the 80s? thanks.
Railway Magazine July 1974 has a 2 page article "Service to the steel industry". This is mostly about the Tyne Dock-Consett ore trains that ended in March 1974, with traction provided by pairs of class 24s. The article does include some information about the replacement Redcar-Consett iron ore trains that were hauled by pairs of class 37s.Does anyone know if any of the many railway magazines have featured articles on the line to consett, featuring the class 37s with iron ore during the 70s, until it’s closure in the 80s? thanks.
Thanks for that. I am aware of that particular article. I’ve heard that it was a bad move allocating the class 24/5s on the Consett line. Those trains were notoriously unreliable.Railway Magazine July 1974 has a 2 page article "Service to the steel industry". This is mostly about the Tyne Dock-Consett ore trains that ended in March 1974, with traction provided by pairs of class 24s. The article does include some information about the replacement Redcar-Consett iron ore trains that were hauled by pairs of class 37s.
Gateshead had a dedicated pool of class 24s D5102-D5111 for the Tyne Dock-Consett iron ore trains. They were specially equipped with air pumps and connectors to operate the doors on the wagons.I’ve heard that it was a bad move allocating the class 24/5s on the Consett line.
Gateshead had a dedicated pool of class 24s D5102-D5111 for the Tyne Dock-Consett iron ore trains. They were specially equipped with air pumps and connectors to operate the doors on the wagons.
Class 25s did not work the Tyne Dock-Consett iron ore trains as they were not equipped with the air pumps and connectors needed to operate the doors on the wagons.from pelaw it is uphill all the way to consett. i’ve read that those 24/5s were continuously failing.