Putting together information mainly from the new edition of 'Rail' magazine (Issue 665 - Page 6) but from other information around, it would appear that the IEP Fleet is to be as follows:
100 trains consisting of
-- 11 trains of 8 coaches (88 coaches)
-- 89 trains of 5 coaches (435 coaches)
giving a total of 533 coaches.
Of the 100 trains:
30 are Electric consisting of
-- all 11 of the 8-coach trains (making 88 coaches)
-- 19 of the 5-coach trains (making 95 coaches)
70 are Bi-Mode consisting of
-- 70 of the 5-coach trains (making 350 coaches)
Great Western is to receive:
-- all 11 of the 8-coach Electric trains (88 coaches)
-- 9 of the 19 Electric 5-coach trains (45 coaches)
-- 35 of the 70 Bi-Mode 5-coach trains (175 coaches)
giving a total of 55 trains and 308 coaches
East Coast is to receive:
-- 10 of the 19 Electric 5-Coach trains (50 coaches)
-- 35 of the 70 Bi-Mode 5-coach trains (175 coaches)
giving a total of 45 trains and 225 coaches
So of the 533 coaches, 183 are Electric and 350 Bi-Mode
Note that East Coast is to keep all its stock of Class 91 plus Mark IV coaches until further notice, so the new stock just replaces and augments its 13-strong HST Fleet.
With all its HST Fleet being 8-coaches (I think), the new allocation of 225 coaches gives a net addition of 121 coaches over the HST stock of 104 (13 times 8), so that is quite a reasonable net addition.
I don't have comparable figures for Great Western where anyway the plan is to keep some of the HSTs for the Plymouth/Penzance trains for a while longer (no time frame given).
Hopefully with a supply of HSTs being freed up, not all will go to the scrap heap straightaway, some may be used for other secondary services (Worcester, Hereford et al).
I hope this Table is useful and informative. I believe it to be correct but am happy to receive corrections if anyone feels some have to be made.
100 trains consisting of
-- 11 trains of 8 coaches (88 coaches)
-- 89 trains of 5 coaches (435 coaches)
giving a total of 533 coaches.
Of the 100 trains:
30 are Electric consisting of
-- all 11 of the 8-coach trains (making 88 coaches)
-- 19 of the 5-coach trains (making 95 coaches)
70 are Bi-Mode consisting of
-- 70 of the 5-coach trains (making 350 coaches)
Great Western is to receive:
-- all 11 of the 8-coach Electric trains (88 coaches)
-- 9 of the 19 Electric 5-coach trains (45 coaches)
-- 35 of the 70 Bi-Mode 5-coach trains (175 coaches)
giving a total of 55 trains and 308 coaches
East Coast is to receive:
-- 10 of the 19 Electric 5-Coach trains (50 coaches)
-- 35 of the 70 Bi-Mode 5-coach trains (175 coaches)
giving a total of 45 trains and 225 coaches
So of the 533 coaches, 183 are Electric and 350 Bi-Mode
Note that East Coast is to keep all its stock of Class 91 plus Mark IV coaches until further notice, so the new stock just replaces and augments its 13-strong HST Fleet.
With all its HST Fleet being 8-coaches (I think), the new allocation of 225 coaches gives a net addition of 121 coaches over the HST stock of 104 (13 times 8), so that is quite a reasonable net addition.
I don't have comparable figures for Great Western where anyway the plan is to keep some of the HSTs for the Plymouth/Penzance trains for a while longer (no time frame given).
Hopefully with a supply of HSTs being freed up, not all will go to the scrap heap straightaway, some may be used for other secondary services (Worcester, Hereford et al).
I hope this Table is useful and informative. I believe it to be correct but am happy to receive corrections if anyone feels some have to be made.