Interesting one, I thought I would ask the forum's opinion on.
If, due to an unexpected event outside of the TOC's control (i.e signal failure), you get stuck somewhere, and then ticket acceptance is granted to another operator at a station nearby to your destination. Ticket acceptance with the participating TOCs is done under 'acceptance via any reasonable route', but you have to pay for the cost of the onward leg from the station with another TOC (as the TOC you have your ticket with cannot get you there). What's the situation regarding compensation for this additional ticket?
Rough example, going from Leeds to Headbolt Lane via Liverpool, due to issues getting there via the Northern method (and there being ticket acceptance with TPE the other way around) and having to pay for the Merseyrail leg as it is outside of any agreed ticket acceptance (Ticket acceptance only being with the likes of TPE/EMR/etc).
This is a question I posed to Northern, which they reasonably addressed by referencing the Consumer Rights Act and explaining that a signal fault is an issue outside of their control. I know they are correct with this. However, what about scenarios where the last train to your destination station (on the TOC in question) is also cancelled, meaning even if you went via the normal, ticketed route, you would get stranded at a connecting station anyway, having been unable to use the last train of the day that you were supposed to. In this example, the final train of the day to your destination *was not* cancelled due to a signal or fault that the TOC cannot control, but rather as an issue with staff (controllable).
And due to the earlier uncontrollable issues blocking the line, you were advised to get to your destination through the use of the agreed ticket acceptance with other TOCs to the only possible connection point then purchasing the additional ticket after they informed you to do so.
Is this not where NRCoT 28.2 can be enacted for the reasonable costs incurred? Where the customer has have had to pay for the alternative route due to being stranded by a service issue within the TOCs control. It seems sensible and both economical for the train company to cover your alternative route/ticket by rail that you had to purchase as opposed to the alternative, like insisting on a taxi from that connecting station, especially when a taxi may be very expensive for the distance required.
If, due to an unexpected event outside of the TOC's control (i.e signal failure), you get stuck somewhere, and then ticket acceptance is granted to another operator at a station nearby to your destination. Ticket acceptance with the participating TOCs is done under 'acceptance via any reasonable route', but you have to pay for the cost of the onward leg from the station with another TOC (as the TOC you have your ticket with cannot get you there). What's the situation regarding compensation for this additional ticket?
Rough example, going from Leeds to Headbolt Lane via Liverpool, due to issues getting there via the Northern method (and there being ticket acceptance with TPE the other way around) and having to pay for the Merseyrail leg as it is outside of any agreed ticket acceptance (Ticket acceptance only being with the likes of TPE/EMR/etc).
This is a question I posed to Northern, which they reasonably addressed by referencing the Consumer Rights Act and explaining that a signal fault is an issue outside of their control. I know they are correct with this. However, what about scenarios where the last train to your destination station (on the TOC in question) is also cancelled, meaning even if you went via the normal, ticketed route, you would get stranded at a connecting station anyway, having been unable to use the last train of the day that you were supposed to. In this example, the final train of the day to your destination *was not* cancelled due to a signal or fault that the TOC cannot control, but rather as an issue with staff (controllable).
And due to the earlier uncontrollable issues blocking the line, you were advised to get to your destination through the use of the agreed ticket acceptance with other TOCs to the only possible connection point then purchasing the additional ticket after they informed you to do so.
Is this not where NRCoT 28.2 can be enacted for the reasonable costs incurred? Where the customer has have had to pay for the alternative route due to being stranded by a service issue within the TOCs control. It seems sensible and both economical for the train company to cover your alternative route/ticket by rail that you had to purchase as opposed to the alternative, like insisting on a taxi from that connecting station, especially when a taxi may be very expensive for the distance required.
Last edited: