And that is just another level of lack of information. Whenever something this big happens, the news bulletins lump rail in with the other transport systems as being "in chaos", when, in fact a fairly structured emergency plan is in operation. (Road generally gives up, air delays everything by several hours). What is needed is a respected, communicative central body explaining rail's situation (including the bit about ice being more difficult). So where is the ATOC representative being interviewed on every bulletin?:roll::roll:
That a very good point but way above my level. Its not hard to say at least we're running a service at speeds you would be insane to drive in under these conditions.
Would it not make sense for all TOCs to publish, in advance, a known timetable that will automatically be implemented in the event of severe ice/snow/wind/heat/plague of frogs etc. That way all staff will have details of the changed running patterns and at least regular users will know what to expect. I accept that sometimes circumstances may be so severe that even the contingency timetable cannot be implemented, but as most large corporate organisations have a "disaster recovery plan", the TOCs must have the same.
What annoys passengers is the apparent secrecy that surrounds any "incedent" and delays are attributed to things like "operating incedent" or "passenger action" or some other similar meaningless phrase. Just tell us if the reason why our trains aren't running is because points have failed at ....... or an ambulance has been called to help a person who has been taken ill. Then tell us what you are doing to remedy the situation and how long we will, realistically, be delayed.
Thats a really bad idea. Every disprution is different and one size all would cause more harm than good. For example if you had a problem where your slow lines were out of us and you tried to use the same plan as a complete block then you'd end up with no service.
There are plans, for exmaple on the Thameslink side of FCC, there is 30 odd plans with if this happens this should be done. The hard work in figuring out what needs to be done has already been done. Whats needed it sticking to these plans but lately something else has come along and destroyed any chance of this plans.
There is also what they call the white period where people who have the ability to change things are too busy to actually go around telling the railway and get on with fixing this. This tends to be the first hour so little information comes out offically so staff then have to try and deal with this. As for manual announcements, well if staff are unsure which leads to no announcements. The railway, or rather from my point of view, is getting better at getting the information out there quicker but its never going to be quick enough as the effects are instant.
Plus Im sure you would or the public would complain if the TOC had trains sat around because they stuck to one plan to the letter and let the chance of additional services for the people caught up in the disprution to have helped out.
Stooged around at New St first thing this morning when the whole Up London peak service collapsed for the second day running and yet again absolutely no information forthcoming as to why and so making it impossible to judge the best course of action.
Yesterday the National Rail Enquiries website showed everything running OK, (as it did yesterday) and this morning only the first two Down services were shown as running late. Everything else was shown as OK at 0650.
At New St, Virgin was just cancelling each of the London services towards departure time, even though for example the 0750 stock was not expected in until 0930ish it was still showing as on time initially.
Eventually punters were put on a cross country service to Nuneaton where the next London service was then reported as being 20 late. When it arrived the restaurant had run out of food even though the First Class was not that busy :roll::roll: Ye Gods !
Had they announced the real problem (a freight train failure I am told) it would have been better to sit it out bearing in mind how long the job had then been stood.
Never did find out what ocurred in London to cause the first two Down services to be heavily delayed.
This week has demonstrated to me that we (the Industry) really DO have a major problem, which bearing in mind the lengths we go to on Infrastructure to ensure we do not affect services, feels as if we are being let down by the very people who are the first to criticise if we over-run by a few minutes. Talk about living in glass houses :roll::roll:
The countdown machines have one massive problem. If a train doesn't move then it assumes that the train is on the move and doesn't add a delay. Its only once it picks it up again that it manages to correct itself. It doesn't help that inbetween sections there can be black spots where trains dissapear and reappear causing problems for staff trying to track the trains and manual update CIS like alot of staff do.
i think we all know things can be done differently but until its really tested how can we know if a system works.