Ive been at skipton today,the broughton road sidings are getting extended and a 4th road installed,all lines will be wired with new ole structures.How likely are these two stations to be reconnected via Skipton in the near future?
Ive been at skipton today,the broughton road sidings are getting extended and a 4th road installed,all lines will be wired with new ole structures.
This is for the new direct skipton to london services which will start in december.Is the old route to colne the one that goes round the corner?its called rylstone? There's a group called selrap i think they are trying to get the dft to do a feasibilty study into reopening it
With what traction do they run at the present moment? Where did the colne line come out at skipton? I followed some of the old trackbed from colne into skipton but couldn't see where it came out at skipton.Kings Cross-Skipton services have always existed...
No, Rylstone is on the Bolton Abbey branch, and heads totally the wrong way for Colne...
With what traction do they run at the present moment?
That must be why we are extending the sidings,they must be planning on using IC225's more,do they not stable IC225's at skipton at the moment?HST southbound on a morning and IC225 northbound on an evening (M-F). HST both ways on Saturdays and there is no service on Sundays.
There's a group called selrap i think they are trying to get the dft to do a feasibilty study into reopening it
The site of Skipton North junction is where the Gargrave line curves off to the right, heading north west, just after the line is crossed by the bypass.Where did the colne line come out at skipton? I followed some of the old trackbed from colne into skipton but couldn't see where it came out at skipton.
I think Colne-Skipton will be reopened before 2025.
How likely are these two stations to be reconnected via Skipton in the near future?
How likely are these two stations to be reconnected via Skipton in the near future?
SELRAP (The Skipton East Lancs Railway Action Partnership) have applied for a total of £40 million of bid funding from the Government's Regional Growth Fund (Round 2), in order to drive foward its campaign to reinstate the heavy rail link between Colne and Skipton
Currently the Embsay group are trying to source approximately £2 million to fund a set of points
If a set of points costs £2m then I can't imagine that £40m of Government money is going to contribute much to a line between Skipton and Colne. It'd be a luxury to fund in prosperous economic times, but its a waste of money in the current climate.
Kings Cross-Skipton services have always existed...