lancastrian, so the last government were morons! I certainly don't rate the coalition one bit, in fact it frightens me what they are capable of doing, knowing the Tories track record! Don't forget they closed the Pits, Steelworks & the worst, attempted to close the Settle & Carlisle Railway!

I expect the Lib Dems to make things very difficult for Cameron soon!

The Tories under Margaret Thatcher also closed the Woodhead Line in 1981 - with hindsight, one of the most disasterous mistakes to make.

Regarding the Lib Dems making things difficult for Cameron soon, I wouldn't hold your breath. So far, they've simply collapsed and rolled-over.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
Just think that if the Woodhead line was still open, it would be electrified at 25kV, so all those AC locos that were scrapped would still be in traffic.
 

PinzaC55

Member
Joined
6 Sep 2010
Messages
548
Just think that if the Woodhead line was still open, it would be electrified at 25kV, so all those AC locos that were scrapped would still be in traffic.

And don't forget that as part of their Transpennine franchise bid Arriva would have reopened the Woodhead. The government turned it down.
 

lancastrian

Member
Joined
2 Jan 2010
Messages
537
Location
Bolton, Lancashire
lancastrian, so the last government were morons! I certainly don't rate the coalition one bit, in fact it frightens me what they are capable of doing, knowing the Tories track record! Don't forget they closed the Pits, Steelworks & the worst, attempted to close the Settle & Carlisle Railway!

I expect the Lib Dems to make things very difficult for Cameron soon!

I am sorry that I did not make myself clear enough, I consider most (at least 99%) of all politicans to be morrons. In fact apart from Lord Adonis and so far the current bloke Philip Hammond, we haven't had a decent Minister of Transport for many years from any political party. I hold no brief for the Tories, as it was under them that Beeching was given the task of destroying the railways, and even when Labour came to power in 64, they did nothing to stop the destruction of the railways. What was ripped up in the late 50's and 60's and on into the 70's with further 'rationalisation', is costing us the tax payer, billions to correct, and even then short sightedness from pillock politicans of all parties (apart from the two mentioned above) means that they only invest half heartedly, and so it often has to be redone again.

Sorry to go on, but I trust NO POLITICAN of any party to get it right where our transport system is concerned, in general they are mostly useless.
 
Last edited:

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
lancastrian, I agree with you. It doesn't matter who the Transport Minister is as most haven't a clue on Transport & I wouldn't trust them with a model railway!
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
I would agree with reopening Woodhead, you need something to relieve the Hope Valley. Not sure about AC though, would be a bit pointless as all you would achieve is a Manchester-Sheffield only service, before having to go diesel to get further!
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
Why Hellifield? Theres nothing there.

Somewhere useful, maybe Settle should be the turnback point, only an extra 7 minutes.

Maybe every second one should run right through to Carlisle.
 

PinzaC55

Member
Joined
6 Sep 2010
Messages
548
Really. What traffic would be using it?

From this site http://www.2d53.co.uk/25yrsago/25yrsago1078.htm

"Quote" Even more tenuous connection: In the original tendering for the Trans Pennine franchise, Arriva's bid included reopening the route over Woodhead, and running a new service between Manchester and Sheffield with a journey time of 35 minutes. This was far too ambitious for the SRA, so Arriva didn't make the cut. They obviously learnt their lesson, and got the Wales & Borders franchise by offering extra car parking, some leaflets in Welsh and 7 Class 150s. Both Virgin and Central Railway have also proposed reopening, but the only traffic passing is on foot, bicycle or horseback.

Slightly sarcastic in tone but appropriate.

I'd think that if a private company was willing to spend enormous amounts of money reopening a main line, they must have figured there was potential traffic for the line?

Historically, Beeching was brought in by the Tories, but Labour under Harold Wilson promised to stop the closures but immediately reneged on that promise and continued what the Tories started. With the Serpell Report the Tories planned more closures especially the Settle & Carlisle but were only defeated by a concerted campaign.
The Tories under Major privatised the railways, then Blair promised to renationalise them but went back on that promise as he so often did. He continued to entrench privatisation and pour public money into private companies hands.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
From this site http://www.2d53.co.uk/25yrsago/25yrsago1078.htm

"Quote" Even more tenuous connection: In the original tendering for the Trans Pennine franchise, Arriva's bid included reopening the route over Woodhead, and running a new service between Manchester and Sheffield with a journey time of 35 minutes. This was far too ambitious for the SRA, so Arriva didn't make the cut. They obviously learnt their lesson, and got the Wales & Borders franchise by offering extra car parking, some leaflets in Welsh and 7 Class 150s. Both Virgin and Central Railway have also proposed reopening, but the only traffic passing is on foot, bicycle or horseback.

Slightly sarcastic in tone but appropriate.

I'd think that if a private company was willing to spend enormous amounts of money reopening a main line, they must have figured there was potential traffic for the line?

I have seen what private companies have supposedly offered but they wanted the whole operation underpinned with tax payers money (Arriva and Central Railway).

The Hope Valley is only 8 tph and Diggle is less as far as I can count. Both are due to gain capacity enhancements.

I personally think the only way Woodhead could justifiably be opened is as part of a transpennine High Speed route.
 

PinzaC55

Member
Joined
6 Sep 2010
Messages
548
"I have seen what private companies have supposedly offered but they wanted the whole operation underpinned with tax payers money (Arriva and Central Railway)."

I don't recall any mention of taxpayers money being involved in the Arriva franchise bid. If you do, link me to where I can read about it. If it was part of the franchise they would HAVE to do it or they would lose the franchise. Even if it did involve taxpayers money it would be a net gain to the UK so win/win.

"The Hope Valley is only 8 tph and Diggle is less as far as I can count. Both are due to gain capacity enhancements."

I'm not very knowledgeable about the Hope Valley line but if it is 8 trains an hour in each direction and several of those are stopping trains or slow moving freights, 8 an hour is serious saturation, particularly on a line which I think is still Absolute Block?

"I personally think the only way Woodhead could justifiably be opened is as part of a transpennine High Speed route."

From where to where? Arriva and Virgin thought it was viable as an ordinary line albeit probably very fast. They are in a better position to say whether it is viable as they have experts on their side.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
"The Hope Valley is only 8 tph and Diggle is less as far as I can count. Both are due to gain capacity enhancements."

I'm not very knowledgeable about the Hope Valley line but if it is 8 trains an hour in each direction and several of those are stopping trains or slow moving freights, 8 an hour is serious saturation, particularly on a line which I think is still Absolute Block?
There's currently no more than 3tph (passenger) over the Hope Valley in each direction. It's not Absolute Block as such that limits the capacity; it's the effect the stopping passenger has. There ought to be a reasonably free couple of paths between the two fast passengers on the other side of the hour to the stopper; when the Project Rio HSTs were running (in that path?), things seemed pretty close to capacity though. So about 4 or 5tph at most, whereas that's what Diggle gets in passenger traffic alone (and is close to capacity, surely, at that).
 

PinzaC55

Member
Joined
6 Sep 2010
Messages
548
The irony of the Diggle route is that of course it used to be mostly 4 tracks till BR reduced it in - about 1983 I think? The major constraint is Standedge tunnel where first Railtrack and then NR have waffled about reopening one or both of the disused bores but never get round to it.Apparently at least one of the bores is so close to collapse it has a girder frame inside it.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
lancastrian, so the last government were morons! I certainly don't rate the coalition one bit, in fact it frightens me what they are capable of doing, knowing the Tories track record! Don't forget they closed the Pits, Steelworks & the worst, attempted to close the Settle & Carlisle Railway!

I expect the Lib Dems to make things very difficult for Cameron soon!

Sorry - but your comments about the S&C are a gross misrepresentation of the truth.

The attempt to close the S&C was engineered and initiated by BR management - NOT any politicians.

BR had been running down the S&C since the late 60s. By the early 1980s it had a skeleton service, few open stations and some imminent bills owing to a lack of maintenance and investment, notably the Ribblehead viaduct.

BR's management proposed closure, which went out to consultation. The Thatcher government actually blocked BR's attempt to close it owing to the representations made - the Minister who declined BR's closure request was Michael Portillo.
--- old post above --- --- new post below ---
The Tories under Margaret Thatcher also closed the Woodhead Line in 1981 - with hindsight, one of the most disasterous mistakes to make.

Regarding the Lib Dems making things difficult for Cameron soon, I wouldn't hold your breath. So far, they've simply collapsed and rolled-over.

And as with comments elsewhere about the Thatcher government and the S&C - this comment about Woodhead is similarly incorrect.

The government did NOT seek closure.

BR management applied for closure - the problem for the Woodhead route was the line had been freight only from Hadfield for a number of years, so there were no objections owing to withdrawl of service. As with the S&C, investment had been limited for a number of years, so the infrastructure would have required investment.

In this case, there was no practical reason the government could have blocked the closure.
--- old post above --- --- new post below ---
From this site http://www.2d53.co.uk/25yrsago/25yrsago1078.htm

"Quote" Even more tenuous connection: In the original tendering for the Trans Pennine franchise, Arriva's bid included reopening the route over Woodhead, and running a new service between Manchester and Sheffield with a journey time of 35 minutes. This was far too ambitious for the SRA, so Arriva didn't make the cut. They obviously learnt their lesson, and got the Wales & Borders franchise by offering extra car parking, some leaflets in Welsh and 7 Class 150s. Both Virgin and Central Railway have also proposed reopening, but the only traffic passing is on foot, bicycle or horseback.

Slightly sarcastic in tone but appropriate.

I'd think that if a private company was willing to spend enormous amounts of money reopening a main line, they must have figured there was potential traffic for the line?

Historically, Beeching was brought in by the Tories, but Labour under Harold Wilson promised to stop the closures but immediately reneged on that promise and continued what the Tories started. With the Serpell Report the Tories planned more closures especially the Settle & Carlisle but were only defeated by a concerted campaign.
The Tories under Major privatised the railways, then Blair promised to renationalise them but went back on that promise as he so often did. He continued to entrench privatisation and pour public money into private companies hands.

I've already pointed out the government wasn't seeking the closure of the S&C - that was BR management.

The Serpell comment needs far more context.

Firstly there was the economic situation of the time - which was not dissimilar to the circumstances faced today.

Also "In many ways, 1982 represented the nadir of Britain's railways. That year saw the lowest number of passenger journeys of the second half of the 20th century, the lowest level of passenger-miles, and the lowest (real) level of passenger revenue since 1968.[1] Although these figures were partly the result of the 1982 strike (over rostering arrangements), rail passenger numbers had been in steady decline since 1957. (Only 1978-1980 saw consecutive years of passenger growth). In 1982 terms, revenues had decreased steadily from £2,300 million in 1970 to £1,800 million in 1982, while costs had risen from £2,500 million to £2,700 million.[2] Consequently, BR's deficit had increased by a factor of 4.5."

Source - Wikipedia http://en.wikipedia.org/wiki/Serpell_report

So the background was a poor economic situation and BR's costs were rising whilst it's revenue was falling.

Serpell, rightly, was commissioned to carry out a number of 'what if' studies.

As it turns out, economic recovery saw an uplift in passenger numbers and consequently revenue, so the need for such drastic action was avoided. But to pretend it was ideologically driven is disingenuous. Instead it was an acknowledgement that endlessly increasing subsidies were unsustainable.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,312
Location
Yorks
There was a collusion between various Governments which had kept the railway on a very low subsidy in comparison other European countries, and a BR management, which still had a Beeching style aversion to rural routes and had to live within its means. This meant that when it had to decide where to make a cut, rural routes often got the chop.

Fortunately for everyone, the local population fought long and hard to keep the Settle - Carlisle open, and the route manager - brought in to oversee closure, kept an open mind, allowing business to tentatively grow. The Government of the time had to abide by due process and eventually, in the face of increasing passenger numbers, gave a reprieve.

To anyone interested, I recommend reading “The Line That Refused To Die” by Stan Abbott and Alan Whitehouse.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,052
Location
Reston City Centre
Sorry - but your comments about the S&C are a gross misrepresentation of the truth.

The attempt to close the S&C was engineered and initiated by BR management - NOT any politicians.

BR had been running down the S&C since the late 60s. By the early 1980s it had a skeleton service

If British Rail had been running it down for a good twenty(ish) years then how come the S&C stayed two-line for the whole route (with the understandable exception of Ribblehead)?

IF this was their aim then surely they'd have downgraded several parts to single track?

My reading of the situation is that its a little like the BBC's proposed closure of 6Music. Just my opinion.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
If British Rail had been running it down for a good twenty(ish) years then how come the S&C stayed two-line for the whole route (with the understandable exception of Ribblehead)?

IF this was their aim then surely they'd have downgraded several parts to single track?

My reading of the situation is that its a little like the BBC's proposed closure of 6Music. Just my opinion.
Very expensive because this requires the installation of points at very remote locations.
--- old post above --- --- new post below ---
The irony of the Diggle route is that of course it used to be mostly 4 tracks till BR reduced it in - about 1983 I think? The major constraint is Standedge tunnel where first Railtrack and then NR have waffled about reopening one or both of the disused bores but never get round to it.Apparently at least one of the bores is so close to collapse it has a girder frame inside it.

"I have seen what private companies have supposedly offered but they wanted the whole operation underpinned with tax payers money (Arriva and Central Railway)."

I don't recall any mention of taxpayers money being involved in the Arriva franchise bid. If you do, link me to where I can read about it. If it was part of the franchise they would HAVE to do it or they would lose the franchise. Even if it did involve taxpayers money it would be a net gain to the UK so win/win.

"The Hope Valley is only 8 tph and Diggle is less as far as I can count. Both are due to gain capacity enhancements."

I'm not very knowledgeable about the Hope Valley line but if it is 8 trains an hour in each direction and several of those are stopping trains or slow moving freights, 8 an hour is serious saturation, particularly on a line which I think is still Absolute Block?

"I personally think the only way Woodhead could justifiably be opened is as part of a transpennine High Speed route."

From where to where? Arriva and Virgin thought it was viable as an ordinary line albeit probably very fast. They are in a better position to say whether it is viable as they have experts on their side.

Of course taxpayers money was involved in the Arriva bid. As a franchise and having signed up to it, the government would be used as the ultimate insurance party for the project because they had signed up to it. Half finished or still sitting as a detailed consultation document would make it a white elephant, not an asset.

Sorry about the 8tph, I had heard it from somewhere and I assume it is about paths through the Dore single line section.

This is not saturation for a railway line by any manner of means. 15 in each direction is saturation. All of these issues on the Hope Valley have identifiable and cheaper solutions than the reopening of the Woodhead route.

Diggle is the same. It needs a set of loops and Network Rail has identified Diggle tunnels as being the best area to put these in. This will release some much needed capacity on the route. Also don't forget the length of trains on these two routes, which is pitiful when some of you think Woodhead deserves reopening.

The Woodhead route runs from South Manchester to North Sheffield which is a pretty good stab at where HS3/4 will slow down. A comprimise could see one of the branches removed and trains sent through the Woodhead formation.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
Obviously reversible platforms at Hellifield would be a complete resignalling job!


To bring matters into perspective, on 29th July 1994, passenger services were re-instated from Blackburn to Clitheroe, with stations at:-
Ramsgreave and Wilpshire
Langho
Whalley
Clitheroe.

The station area at Clitheroe received a great deal of funding which provides an excellant rail/bus interchange which has won an award with many buses making connections to and from the rail service, including Preston, Skipton, Accrington, Burnley and Blackburn. There are some local area services for local commuters. If you are ever in Clitheroe and car driving means you miss seeing a widely varied area of North Lancashire, I can recommend the use of the B10/B11 Bowland Transit bi-directional Clitheroe-Slaidburn-Clitheroe services, which believe it or not, serves a hamlet with the name of COW ARK!!!

The passenger loading figures at Clitheroe station from 2004 to 2009 are as follows:-
2004/2005..............202,000
2005/2006..............218,000
2006/2007..............231,000
2007/2008..............237,000
2008/2009..............228.000
Clitheroe station should be viewed as a radial hub serving quite a large area with good interchange facilities.
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
Perhaps some of Northern's existing Manchester-Clitheroe services could be extended to Hellifield to connect with existing Northern Leeds-Carlisle services, and there might even be a new peak-hour train from Skipton in the morning and returning from Manchester in the evening, reversing at Hellifield. .

I did write to Northern Rail at Leeds bringing the points that you made here, in addition to three other points made by me concerned with the line from Bolton to Blackburn.

In their reply, all my three points were clarified by them, but no mention whatsoever was made by them to your point. Maybe their lack of silence on the matter is answer enough.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
The problem is that the answer is that there is no answer. It has not really been considered. Is there a possible connection with the early morning service to and from Carlisle and the late ones.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
It is a pity that both Clitheroe and Colne are viewed at teminal passenger stations on branch lines by Northern. Only the Settle and Carlisle special trains through Clitheroe in the warmer parts of the year with tourist potential see trains using the line through to Hellifield.

At least, we should be thankful that the route is still in existance, unlike the more southerly line from Colne to Skipton.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
What else do you expect Northern to view Colne (a terminal station at the end of a branch line) as?

I was referring to what this line used to be, which was a direct cross-pennine route through to Skipton. Admittedly, when the cotton industry was in its prime, many of the towns on the line were much more prosperous than they are today. including Blackburn, Accrington and Burnley.

The M65 motorway too seems to be in the same position as terminating in the area of Colne and not giving a link into Skipton.

Perhaps the Todmorden Chord project plus the existing line through Hebden Bridge are now the recognised cross-Pennine links to West Yorkshire from this part of North Lancashire.
 
Last edited:

Spaceflower

Established Member
Joined
13 Jul 2007
Messages
1,506
I personally can't see the point of extending services to Hellifield on a regular basis as much of the S & C is dependant on tourist traffic. In fact, I think for what it is, its rather well connected, with regular stopping services running through some pretty expensive remote communities on two seperate axis and a third sunday only.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,250
Location
Yorkshire
I did write to Northern Rail at Leeds bringing the points that you made here, in addition to three other points made by me concerned with the line from Bolton to Blackburn.

In their reply, all my three points were clarified by them, but no mention whatsoever was made by them to your point. Maybe their lack of silence on the matter is answer enough.
If I was Northern I would say something like "I'm sorry but we are a franchise operator who operates the franchise in accordance with the specifications provided by the DfT. I suggest you write to the DfT at the following address...."

I don't think the DfT would take much notice of correspondence from a specific individual though, I'd contact the relevant MP(s).
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,400
Location
A typical commuter-belt part of north-west England
If I was Northern I would say something like "I'm sorry but we are a franchise operator who operates the franchise in accordance with the specifications provided by the DfT. I suggest you write to the DfT at the following address...."

I don't think the DfT would take much notice of correspondence from a specific individual though, I'd contact the relevant MP(s).

At the time, I had an unrelated matter of items that I was writing to Northern at Leeds about, on behalf of some friends in the Darwen area. I did see the posting of the forum member on this thread, so I added this to my letter. It was not any point of mine that was not answered, only the one added to my letter.
 

Buttsy

Established Member
Joined
20 May 2011
Messages
1,374
Location
Hanborough
Surely, it would not be beyond the collective intelligence of even our politicans to come up with a system in which a trial three year period could introduced to try out new services. If they are not working after that time, they could either be closed down or if they are close to breakeven, a second three period could be allowed. However, after a maximum of six years, the choice would be to either to maintain it as a full service, or to close it down with no consquicenses.

What ever happened to the Speller Amendment Act 1982 which allowed services to be started on an experimental basis and withdrawn without closure procedures if considered not successful in 2 years? I believe this is how Corby lost its service in the late 80s/early 90s.
 