CONTEXT: The line between Cleethorpes & Grimsby Town was singled in 1985, with a passing loop (now barely used) 250 yards south of Grimsby Docks.
This layout has caused a number of pathing issues, limiting the number of services able to use Cleethorpes.
What I was wondering was how reasonable would it be to re-double it, the only *major* issues I can think of is:
1: The 3 bridges over Doughty Road, Peaks Parkway & Ellis Way,
2: Whether or not a double Fish Dock Road curve would be too sharp to meet modern requirements,
3: Space at Grimsby Docks for an up platform.
Apart from those 3 issues, the alignment is there, even the new Suggits Lane bridge was built with space for an extra track.
This layout has caused a number of pathing issues, limiting the number of services able to use Cleethorpes.
What I was wondering was how reasonable would it be to re-double it, the only *major* issues I can think of is:
1: The 3 bridges over Doughty Road, Peaks Parkway & Ellis Way,
2: Whether or not a double Fish Dock Road curve would be too sharp to meet modern requirements,
3: Space at Grimsby Docks for an up platform.
Apart from those 3 issues, the alignment is there, even the new Suggits Lane bridge was built with space for an extra track.