So I'm theory one of these could take a Freightliner container load from Ipswich to Cardiff and use it's diesel / batteries for the short bit of missing wiring between the NLL and the GWML at Acton? There must be other examples where this applies, more of a gap filler than a 66 replacement.
but if the alternative that would have been used on those trains before, because there is a gap so a straight electric loco wouldn't work, was a 66 than a 93 would be replacing a 66
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,886
Location
Cambridge, UK
Lickey incline (Bromsgrove). However it is now electrified, so theoretically no problems (assuming that the power supply can handle it, and power changeover at speed is permitted)
But if you wanted to maximise OHLE and minimise diesel mileage, wouldn't you go Wentloog - GWML - Acton - WCML - Daventry?

Doing Bristol Parkway/STJ - Bromsgrove on Diesel + Battery would probably be too slow with an economically worthwhile length/weight of freight train.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Both 86s and 90s tend to get used in pairs because of the WCML challenges.
The economics of double heading does (just about) work for 86s and 90s that have little residual capital value. But I suspect the operating costs of a pair of 93s would greatly exceed those of a single 66....
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
The economics of double heading does (just about) work for 86s and 90s that have little residual capital value. But I suspect the operating costs of a pair of 93s would greatly exceed those of a single 66....
Which is exactly why the Cl. 99 exists...
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,596
Location
South Staffordshire
Tonyshrum - I would be interested to hear of your friend's qualifications.

AIUI the 93 is basically an improved class 88, and we know 88s work - within their capabilities. I would expect the 93 with it's bigger diesel engine to at least match class 88 performance, even if it cannot be significantly beaten.

Of course, the flux capacitor could have been installed the wrong way round at the factory - maybe
 
Last edited:

birchesgreen

Established Member
Joined
18 Aug 2015
Messages
7,652
Location
Solihull
Somehow i am sceptical that an experienced multi-national locomotive manufacturer would produce a loco that can barely move itself.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,575
Tonyshrum - I would be interested top hears of your friend's qualifications.

AIUI the 93 is basically an improved class 88, and we know 88s work - within their capabilities. I would expect the 93 with it's bigger diesel engine to at least match class 88 performance, even if it cannot be significantly beaten.

Of course, the flux capacitor could have been installed the wrong way round at the factory - maybe
Me too, can't believe something with 1200hp plus battery assistance would haul hardly anything especially with an AC drive system. 25s (similar installed engine power) used to haul quite heavy loads with DC drive systems and even a 73 on diesel is quite capable as long as speed isn't an issue!
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
753
Location
Warrington
Is this.. one of those test runs people have mooted about? I could go and see it
Nahh pretty sure that isn't it. First off - I'm pretty sure the 93 isn't in Crewe yet and should be going to South Yard rather than the DB TMD. The TSC for that move is a DB move.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Is this.. one of those test runs people have mooted about? I could go and see it
Highly doubt it, the class 93 is still at Worksop, and as yet, has still not done a single move on the mainline, including light engine.
 

chazi898

Member
Joined
18 Sep 2021
Messages
30
Location
Can't remember - brain numb
Nevermind then, must've misread, I thought it had made it to Crewe..
When I was on the platform watching Royal Scot on tuesday, some guy showed me a video of a 321 going past, maybe its one of those.
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
753
Location
Warrington
Nevermind then, must've misread, I thought it had made it to Crewe..
When I was on the platform watching Royal Scot on tuesday, some guy showed me a video of a 321 going past, maybe its one of those.
Tbf, recent posts on here indicate that it should have arrived in Crewe by now, along with the mk3 coaches that will supposedly be used as the test load. Alas, its not happened.

As for that move - I'm pretty sure it'll be a 325 but I'm not 100% on that:)
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,420
Location
Cheshire

Townsend Hook

Member
Joined
3 Aug 2011
Messages
932
Location
GB
Jumped the gun a bit - forgot RTT like showing 325s as Electric Locomotive for some reason :/
Although on the subject of pathing, would the Class 93 be pathed at 110mph I'm guessing..?
It could be pathed as any number of things.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,886
Location
Cambridge, UK
Yeah I was more thinking the test runs, just what to look out for.
Although another query is I'd be intrigued to know if it can actually do 110mph in diesel/battery mode. I guess time will tell.

There is a tractive effort versus speed comparison chart in post #243 (copied below). Note that at 110mph on diesel/battery the 93 tractive effort is only a bit below an HST.

Even with only one power car working, a complete HST on level track has a balancing speed of 110-115mph, so in theory the 93 hauling a modest load should do 110mph on diesel/battery (but it'll take a while to get to that speed).

 

chazi898

Member
Joined
18 Sep 2021
Messages
30
Location
Can't remember - brain numb
Interesting, so yes but it will take a while. I can only think of a few scenarios where it might do 110 on diesel/battery, because even most charter trains never go over 100, (unless LSL whip out their Intercity Mk3 rake more regularly) Mk2s limited to 100, etc. The remaining operators of push pull stock don't really want them anymore, sad as it may be (again, unless TfW have a revelation and switch to 93s), its looking bleak on the passenger side of the coin; I could see quite some potential, but its all dictated by the market I guess. I would love them over the pennines, but that's a fever dream now.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,575
There is a tractive effort versus speed comparison chart in post #243 (copied below). Note that at 110mph on diesel/battery the 93 tractive effort is only a bit below an HST.

Even with only one power car working, a complete HST on level track has a balancing speed of 110-115mph, so in theory the 93 hauling a modest load should do 110mph on diesel/battery (but it'll take a while to get to that speed).
Only a bit below an HST isn't saying much as TE very low at that speed!
How long will the battery last? Won't be at 110mph for long until battery depleted, if it makes it at all?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,326
Location
Nottingham
Only a bit below an HST isn't saying much as TE very low at that speed!
How long will the battery last? Won't be at 110mph for long until battery depleted, if it makes it at all?
At 400kW, the 80kWh battery will last 1/5 of an hour, so about 10 minutes.

A single HST power car delivered 1320kW at the rail, effectively the same as a 93 on diesel+battery.

At 900kW on diesel alone, I'd expect the balancing speed of a 93 to be around 100-105mph hauling 8 mk3s and a deadweight class 43.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,729
At 400kW, the 80kWh battery will last 1/5 of an hour, so about 10 minutes.

A single HST power car delivered 1320kW at the rail, effectively the same as a 93 on diesel+battery.

At 900kW on diesel alone, I'd expect the balancing speed of a 93 to be around 100-105mph hauling 8 mk3s and a deadweight class 43.
Hang on, you need to be careful with those ratings. Is the 900kW diesel rating the output at the engine flywheel or at rail? Because I thought it was 900kW engine output. That’s before you make allowance for train supply…
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,820
. The remaining operators of push pull stock don't really want them anymore, sad as it may be (again, unless TfW have a revelation and switch to 93s),
As I've pointed out on other threads where it's been suggested (and I suspect someone else will have already said it here too but I've not had time to go through the whole thread) a 93 simply doesn't have the power on diesel to work the current TfW loco hauled services.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,326
Location
Nottingham
What's meant by 'balancing speed'?

Speed at which forward force due to locomotive balances with frictional forces so no longer accelerates.
And over 100mph, the friction is almost all wind resistance, which varies as the cube of the speed. (So doubling the power of a train will increase its balancing speed by around 25%.)
 