I don't read "RAIL" magazine much anymore, but there was a feature in an issue earlier this year about GBRf and specifically the mention made about consideration being given to fitting some class 92s with small Diesel Engines to operate in the same way as Bombardiers "TRAXX Last Mile" feature/proposal, that made me actually buy it (for the first time in over 18 months.)
And its been going round my head for a while as something seemed, off, about the idea...
Now, its always been my understanding that there are a number of banned/prohibited cargos that are not allowed to be moved through the Channel Tunnel. This relates to my actual point... AIUI while Diesel locos can be dragged through the Tunnel by an electric loco (atm namely a class 92), they are NOT allowed to operate through the tunnel solo due to :
(i) Engine Emmisions Building up in the Tunnel
and (ii) Fuel, In this case Diesel, being on (or very close to) the prohibited list, being in significant quantities...
so my understanding has always been that for a loco be it a DBS/ECR or GBRf class 66 being delivered/dragged to the UK for repairs, conversion etc that the locos fuel tanks have to be drained down to a pre-set limit. Now i don't know what that "limit" is... but surely fitting a small engine (i will in future refer to it as a "Last Mile module") and fuel tank to a class 92 (assuming its physically possible and financially worth it) surely that would make it harder to diagram locos for use on tunnel services...
ie. the DFDS Daventry train that GBRf operate in the UK, Europorte channel Operate through the Tunnel and then Whoever else is involved handles it the rest of the way, is normally class 92 hauled... making it the ideal sort of service to use a class 92 with a "last mile module" so it can operate from the DIRFT Terminal without having to be removed and the actual train load moved in/out of the terminal by a shunter... but it would still be carrying a fair amount of fuel that i would GUESS would have to be above the threshold/limit.. so in that situation would that same class 92 be able to work the service from DIRFT all the way to the tunnel, Through the tunnel and into Calais Frethun yard whilst carrying that flammable fuel
so either it could, and my question is idiotis, or it couldn't meaning a loco change and a loss in productivity.
now i know, that its still a very theoretical situation from start to finish for the moment... but its one that's been buzzing away in my head for a while tha i thought maybe discussing with others would send it buzzing "Away" out of my head.
And its been going round my head for a while as something seemed, off, about the idea...
Now, its always been my understanding that there are a number of banned/prohibited cargos that are not allowed to be moved through the Channel Tunnel. This relates to my actual point... AIUI while Diesel locos can be dragged through the Tunnel by an electric loco (atm namely a class 92), they are NOT allowed to operate through the tunnel solo due to :
(i) Engine Emmisions Building up in the Tunnel
and (ii) Fuel, In this case Diesel, being on (or very close to) the prohibited list, being in significant quantities...
so my understanding has always been that for a loco be it a DBS/ECR or GBRf class 66 being delivered/dragged to the UK for repairs, conversion etc that the locos fuel tanks have to be drained down to a pre-set limit. Now i don't know what that "limit" is... but surely fitting a small engine (i will in future refer to it as a "Last Mile module") and fuel tank to a class 92 (assuming its physically possible and financially worth it) surely that would make it harder to diagram locos for use on tunnel services...
ie. the DFDS Daventry train that GBRf operate in the UK, Europorte channel Operate through the Tunnel and then Whoever else is involved handles it the rest of the way, is normally class 92 hauled... making it the ideal sort of service to use a class 92 with a "last mile module" so it can operate from the DIRFT Terminal without having to be removed and the actual train load moved in/out of the terminal by a shunter... but it would still be carrying a fair amount of fuel that i would GUESS would have to be above the threshold/limit.. so in that situation would that same class 92 be able to work the service from DIRFT all the way to the tunnel, Through the tunnel and into Calais Frethun yard whilst carrying that flammable fuel
so either it could, and my question is idiotis, or it couldn't meaning a loco change and a loss in productivity.