Why are class 92 locomotives not allowed to operate over the Redhill-Tonbridge line despite the line being electrified specifically for them?
You would think that the signalling would have been upgraded as well and I thought it was when the line was electrified.
The sections on the line are large so I would imagine there would not be a lot equipment to replace, but then I am not a signal engineer.
It was always intended that CTR3 would be the core route for Eurostar services to London, because the Tonbridge - Redhill route is comparatively flat and straight in comparison to CTR1/2 and would therefore enable scope for constant 100mph operating speeds - but as I mentioned previously the loading gauge issues at East Croydon rendered the plan.