tbtc
Veteran Member
Mod Note: Posts #1 - #22 originally in this thread.
What work could they realistically do in the UK though?
All of the long distance high speed electrified services will be in the hands of 390/800/801/802s - what services are there out there suited to these thirty year old locos (that were designed to do one specific type of service and aren't particularly suited at other ones - see also Deltics...)
We've tried to tart up ancient stock and look how delayed/ expensive that's turning out to be for people who were wanting their refurbished HSTs or bi-mode 769s or reliable 230s in regular operation by now... it's a false economy, when you consider how much easier/faster it seems to be to churn out a full length IET300 from Newton Aycliffe in the time it takes Wabtec to stick some modern doors onto a single Mk3 carriage...
I was all for converting the 319s or introducing the 230s, I thought that there was merit in upgrading old trains, but it's clearly too much effort, too complicated, too costly, too many unforeseen difficulties... eventually it gets to the point where it'd have been simpler and cheaper and faster to build a brand new train (with a potential forty year life span) than wait around in the hope that the engineers eventually find a way of "upgrading" an old train so that we can squeeze another five years life out of it.
When the facts change, I change my mind.
If anything it's nice to see them going on to further use, though it's a bit of a shame it has to be abroad but better than the knacker's yard.
What work could they realistically do in the UK though?
All of the long distance high speed electrified services will be in the hands of 390/800/801/802s - what services are there out there suited to these thirty year old locos (that were designed to do one specific type of service and aren't particularly suited at other ones - see also Deltics...)
I agree 100% - it's so sad seeing so much stock being dragged for scrap. I know the 91's are old and progress moves on, but it seems that the old trend of "repair and making do" has long gone for "throw it away and replace with new"
We've tried to tart up ancient stock and look how delayed/ expensive that's turning out to be for people who were wanting their refurbished HSTs or bi-mode 769s or reliable 230s in regular operation by now... it's a false economy, when you consider how much easier/faster it seems to be to churn out a full length IET300 from Newton Aycliffe in the time it takes Wabtec to stick some modern doors onto a single Mk3 carriage...
I was all for converting the 319s or introducing the 230s, I thought that there was merit in upgrading old trains, but it's clearly too much effort, too complicated, too costly, too many unforeseen difficulties... eventually it gets to the point where it'd have been simpler and cheaper and faster to build a brand new train (with a potential forty year life span) than wait around in the hope that the engineers eventually find a way of "upgrading" an old train so that we can squeeze another five years life out of it.
When the facts change, I change my mind.
