• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 88 UKDual & EuroDual

Status
Not open for further replies.

captainbigun

Member
Joined
3 May 2009
Messages
977
Remote control via RF isn't new. The South African ore trains use locos throughout the train, mixture of 50kV AC and diesel remote controlled via RF. They can be switched in/out of use as required.

68s have AAR for Chiltern, but it's not a full AAR implementation. They have native multi, asdo the 88s.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Sunbird24

Member
Joined
26 Oct 2013
Messages
395
Location
La Mont Ravana
The basic RF system used in places like South Africa, Australia and USA works fine in wide open spaces such as found in those huge countries but was found to be unsuited to the relatively cramped conditions in Europe with its numerous large conurbations, long tunnels and multiplicity of signalling systems and electrification due to problems found with interference between the various systems and frequent loss of proper communications so a new system had to be devised to overcome all these problems. The Marathon Project was a collaboration of a score of companies throughout Europe to develop a system which would work throughout Europe and without causing any problems with signalling systems and the like. Several locomotive types were used in the trials. Many locomotive types can have part of the system built in with the controllers being a plug-in device which can be easily fitted and removed as required.
While the Marathon project was primarily concerned with increasing train lengths the technology used remains the same for all other purposes related to the control of one locomotive from another remotely, as was demonstrated to me at Vossloh.
 
Last edited:

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
If the wagons/coaches were lower than the height of the locomotive some form of "line of sight" technology could be used.
 

richieb1971

Established Member
Joined
28 Jan 2013
Messages
2,047
Correct, but then it sounds like none of the technologies talked about work in every eventuality.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,674
Location
Croydon
Correct, but then it sounds like none of the technologies talked about work in every eventuality.

I suppose if a technology for communication of control does not work in every eventuality then its useless. It must be safety critical ?. Cannot expect things to be OK except for the times the train is going through a curved tunnel. Even a curved cutting or a curve with a bridge half way along must be a concern as far as line of sight goes.

So does this mean locos talking to each other down the length of a train is only feasible with a wire.

I guess line of sight would be feasible in a yard where the operator is nearby and obviously able to view proceedings (so line of sight would exist). The locos could refuse to work (so stop) if/when the signal is lost/failing.
 
Last edited:

Sunbird24

Member
Joined
26 Oct 2013
Messages
395
Location
La Mont Ravana
I suppose if a technology for communication of control does not work in every eventuality then its useless. It must be safety critical ?. Cannot expect things to be OK except for the times the train is going through a curved tunnel. Even a curved cutting or a curve with a bridge half way along must be a concern as far as line of sight goes.

So does this mean locos talking to each other down the length of a train is only feasible with a wire.

I guess line of sight would be feasible in a yard where the operator is nearby and obviously able to view proceedings (so line of sight would exist). The locos could refuse to work (so stop) if/when the signal is lost/failing.
It was systems in use 7 years ago which did not work satisfactorily
The system devised by the Marathon Project has been proved to work, as I stated earlier, with links to technical details and the final result reports. The French were planning to implement it late last year on the first route subject to the necessary infrastructure changes being implemented, IE., 1500 metre loops at either end of the section. Whether that has happened I don't know.
 

apk55

Member
Joined
7 Jul 2011
Messages
446
Location
Altrincham
Could radio remote control not work by using the GSM radio system used for communication to the drivers. This is supposed to work everywhere using for example leaky feeders in tunnels.
 

bahnause

Member
Joined
30 Dec 2016
Messages
1,037
Location
bülach (switzerland)
I suppose if a technology for communication of control does not work in every eventuality then its useless.
About 15 years ago, we used analog radio communication technology to remote control the loco at the end of some freight trains on the (old) Gotthard route. Lots of tunnels and mountains as you can imagine, so it was impossible for the radio units to keep communication alive all the time. In the case of communication getting lost, the loco at the rear of the train would just keep the last known state. However, a brake application (air brake) would cut off power and apply the dynamic brake of the remote controlled loco, so the brake pipe acted as the "second channel" of the system.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,674
Location
Croydon

Sunbird24

Member
Joined
26 Oct 2013
Messages
395
Location
La Mont Ravana
Thanks for the information.

It that going to be a single delivery or are we expecting the/a ship to carry more than one 88 ?. I seem to recall it being suggested the next deliveries might be for more than one loco at a time.

No idea on that yet Peter, no sign of 1, 4 & 5 at the factory but... they could be inside... went to my usual spot to photo it on the motorway but didn't see it so no idea which way it went. Could not see anything at Sagunto port either, only lots of trams, cars and steel coils as usual. 6, 10 and a new 68 were visible at the factory, did not see 7-9 either.
3 & 4 were said to be going first for driver training and lots of other rumours abound as usual.
I'll just watch for ships leaving for Workington.
Many of the vehicle carriers only have loading ramps rated to 40 or 45 tons max so they can take trams and MU vehicles but not heavy locos.
 

Topgun333

Member
Joined
1 Aug 2013
Messages
165
How will an 88 compare with existing electric locos such as 90s, 91s and 92s in terms of performance?
 

Sunbird24

Member
Joined
26 Oct 2013
Messages
395
Location
La Mont Ravana
How will an 88 compare with existing electric locos such as 90s, 91s and 92s in terms of performance?
88 is mixed traffic, 92 is heavy freight and 91 is high speed passenger so not a true comparison. Probably better than a 90 in electric mode, about similar to an old type 2/3 on diesel subject to load/speed requirements. Cannot realistically supply power to a passenger train in diesel mode as this could reduce its performance dramatically, though T and T with another would be OK. Still lots of tests to do to determine its actual performance in a real-life situation.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
88 is mixed traffic, 92 is heavy freight and 91 is high speed passenger so not a true comparison. Probably better than a 90 in electric mode
I thought 92s were mixed traffic also, having been built with intent to use them on the Nightstar trains that never happened and more-recently being used on the under-wires parts of the Scottish sleeper operation. Also, Wikipedia states a 92 has a top speed of 87mph; not quite the 110mph of a class 90 but still faster than the heavy-freight class 60s which only do 60mph according to Wikipedia.

Good to know that the 88s are on their way, now how about a commitment to a rolling programme of electrification (a slow one, since budget pressures mean it can't be done quickly, but nonetheless continuity of work for an electrification team)?
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,910
How will an 88 compare with existing electric locos such as 90s, 91s and 92s in terms of performance?

Given modern electronics etc, an 88 should outperform 90s and 91s, but for sheer grunt on heavy freights the 92 will win by having 2 more axles.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,674
Location
Croydon
Last edited:

Lemmy99uk

Member
Joined
5 May 2015
Messages
562
General cargo vessel 'Eemslift Nellie' is due to dock at Sagunto in a few hours time to load 4 locos for delivery to Workington docks.
 

Sunbird24

Member
Joined
26 Oct 2013
Messages
395
Location
La Mont Ravana
Last edited:

Sunbird24

Member
Joined
26 Oct 2013
Messages
395
Location
La Mont Ravana
Last edited:

Lemmy99uk

Member
Joined
5 May 2015
Messages
562
Nellie does seem to making heavy weather of the journey, although she is heading in the right direction.

Apologies if the info turns out to be duff but it can be quite addictive following shipping on AIS
 

Darandio

Established Member
Joined
24 Feb 2007
Messages
11,141
Location
Redcar
I thought 92s were mixed traffic also, having been built with intent to use them on the Nightstar trains that never happened and more-recently being used on the under-wires parts of the Scottish sleeper operation. Also, Wikipedia states a 92 has a top speed of 87mph; not quite the 110mph of a class 90 but still faster than the heavy-freight class 60s which only do 60mph according to Wikipedia.

If we are going by definition of what was intended when built, then the Class 91 is also a mixed traffic locomotive.

But we aren't, and that isn't what sunbird24 meant.
 
Status
Not open for further replies.

Top