Yep (and possibly by me) upgrades included in MML electrification but always better to go for belt, braces and elastic especially with lots of extra trains using OHLE especially headspans.I have a feint memory of someone here posting that the OLE on the MML being reinforced in order that EMT (now EMR) trains could run at 125mph where the line speed allows. This had been started by replacing the most troublesome headspans south of St Albans.
I could be wrong of course.
Replacing deadweight tensioning before too many more bouts of hot weather would be good too.