Class 80x bogie modifications?

Status
Not open for further replies.

SolomonSouth

Member
Joined
25 Feb 2021
Messages
398
Location
Gravesend
I heard that the 800s/802s were going to have their bogies modified to prevent future cracking, but haven't seen anything about this online or in the forum.

I would like to know:
- How many sets have been modified, if any?
- When is the program expected to be finished?
- Do the modified sets ride significantly better than the non-modified sets?
- What modifications did they receive? (Or if it hasn't begun yet, what modifications are they going to recieve?)

Thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
I heard that the 800s/802s were going to have their bogies modified to prevent future cracking, but haven't seen anything about this online or in the forum.

I would like to know:
- How many sets have been modified, if any?
- When is the program expected to be finished?
- Do the modified sets ride significantly better than the non-modified sets?
- What modifications did they receive? (Or if it hasn't begun yet, what modifications are they going to recieve?)

Thanks
Don’t think it’s the bogies getting done, it’s part of the bodywork where the yaw dampers meet the body (others will explain better)

List below is what’s been done and what’s currently at Eastleigh, first date is when unit arrived at Eastleigh:-

27/06/2022-GWR 802003-left 05/05/2023
28/07/2022-GWR 800026 left 27/10/2023
30/09/2022-LNER 800205-left 21/02/2023
01/03/2023-LNER 800113-left 29/06/2023
06/07/2023-LNER 800209 leaves tomorrow
14/07/2023-GWR 802011
20/10/2023-GWR 800022
 

SolomonSouth

Member
Joined
25 Feb 2021
Messages
398
Location
Gravesend
Don’t think it’s the bogies getting done, it’s part of the bodywork where the yaw dampers meet the body (others will explain better)

List below is what’s been done and what’s currently at Eastleigh, first date is when unit arrived at Eastleigh:-

27/06/2022-GWR 802003-left 05/05/2023
28/07/2022-GWR 800026 left 27/10/2023
30/09/2022-LNER 800205-left 21/02/2023
01/03/2023-LNER 800113-left 29/06/2023
06/07/2023-LNER 800209 leaves tomorrow
14/07/2023-GWR 802011
20/10/2023-GWR 800022
Thanks! So it seems that they are not finished yet with the modifications.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
At that rate the last one to come out with Mods will go straight to Sims.
My first thought also. 800113s short stay is hopefully a sign of could be achieved if/when they ramp up though
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
IIRC they're just getting more frequent wheelset swaps rather than mods to the bogies themselves ( the Eastleigh work is to body components) - that *might* help ride a bit. IMO they just can't cope with the reality of the GW routes.
 

tomglazed

Member
Joined
3 Apr 2018
Messages
38
To that point of not being able to cope with the routes they serve on, could the significant amount of wheel hunting experienced in these units have contributed to this issue? I can’t imagine an unnecessary amount of shaking from the bogies has helped here.
 

Yew

Established Member
Joined
12 Mar 2011
Messages
7,212
Location
UK
I must admit, the more I think about it, the more I feel that ultimately it is the 26m coach length that is the cause of the ride problems. Hopefully modifications to the bogies can change that, but I worry that there isn't budget for the sorts of modifications and testing that we saw with the MK4. I'm interested to see how the 810's will ride, with a shorter carriage length, and hopefully improved springs/damping that incorporates the lessons of the earlier IEP's
 