Class 802 Diesel Under wires

Steve14

Member
Joined
25 Apr 2015
Messages
152
A bizarre question it may seem but is there any reason why GWR would run their classes 800s and 802s on diesel? The Lizzie line and 387s are running as per normal under electric but have noticed the high speed services wizzing past the Burnham stretch under diesel.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,945
Location
London
A train fault perhaps, maybe even in extreme circumstances a BTET (block to electric traction) due to an OLE fault? Normally they are on the electric until the relevant cross over points.
 

ollyexe2808

Member
Joined
18 Jun 2023
Messages
137
Location
Exeter
This has probably been answered elsewhere so please feel free to close thread and redirect me. I am on an 802 out of Paddington (forming the 16:28 PAD-PNZ service). To my untrained ear it sounds like we are running in diesel mode. Would there be any logic or reasoning for doing this? Never noticed it before on this train. How often does this happen?
 

FR510

Member
Joined
20 Oct 2020
Messages
111
Location
Kent
Was just on one this afternoon from Cardiff to Paddington that switched to diesel from electric at Reading for the remainder into Paddington.
 

Jrocks

Member
Joined
27 Apr 2021
Messages
162
Location
Torbay
All GWR 80x are running on diesel between Paddington and Reading today due to power supply issues on the OLE.

Will be back to Electric running tomorrow however
 

800301

Member
Joined
29 Dec 2022
Messages
522
Location
Essex
Will be back to Electric running tomorrow however

I’ll wait and see, wonder what the actual issue is, and why if they knew there was an issue at midday yesterday did it only require implementing today
 

Jrocks

Member
Joined
27 Apr 2021
Messages
162
Location
Torbay
Will deffo be back to electric. There was power supply issues related to engineering works (the engineering works that happened today) which has been known about for days and days, and the diesel running has been planned for days and days. Nothing that nobody in the know hadn't planned for today. As not to overload the wires, the 80x which can run in diesel mode did, which left enough juice for the 387 and 345s to run.

Note, it was a 2 track Railway in operations today in part if the Thames Valley
 