I haven't heard anything for a while about the CS 73s and have seen pictures of single 73s on the Fort William.
Meanwhile, the 67s aren't infallible to failing. It's not like there was an issue with one recently including fuel leak / some major issue.
Going by my recollection only, over the past few months there have been two significant delays on the Inverness-Edinburgh section itself (i.e. not delays to the Inverness service caused by issues South of Edinburgh). The only one due to loco reliability/failure was a 67 - when 67010 went bang fairly soon after being loaned to GBRf. This was the first 67 VTEC/DB loaned GBRf after bashing up 73969. It was swiftly replaced by 67013, which has indeed been very reliable.
The other delay was when 2x73s were working the service, but despite many jumping to the conclusion the locos were at fault, it transpired the leading loco hit a lineside obstruction of some sort and wiped out its radio/emergency comms and was restricted to 30 (or 40) mph.
In the interest of balance I believe a 73/9 has failed the odd time on either the Aberdeen and/or FW portion in the last few months resulting in the odd significant delay/cancellations (but again no more than any other locos suffer failures I suspect).
Hopefully, the 73s will show their worth on the Inverness. I was pleasantly surprised to see how well the doubled units managed the 11 coaches all the way up to Inverness when it took the Fort Willy portion last month. Maybe that's what blown them out?
I'm not aware any 73/9s have "blown out" recently? The 67 is working the Inverness for the foreseeable as VTEC bumped 73969 at Craigentinny so are loaning GBRf the DB 67 in lieu. 969 is still in Loughborough being repaired (and being fitted with the new couplings for testing with the new stock), and 971 is also in currently, so makes sense to use the 67 where it can replace 2 locos during the period they're 'short'.
The 2x 73s worked the odd Inverness run over the recent Easter/Bank Holiday weekends when the 67 was needed for workings between Glasgow and Edinburgh when the electrified route via Carstairs was closed for engineering. As soon as that was over, the 67 went back on Inverness.
That said, during the last (MayDay) BH weekend, a solo 73 worked the 8-coach Glasgow portion to Edinburgh and also hauled the 8-coach Edinburgh-Polmadie ECS plus 126 tonnes of DIT Class 92 on one occasion.