So we have for the first time a standard train type in the Aventra yet SWR has gone for a new cab design?My understanding was ASLEF didn’t like the 701s and would kick the can along the roads as much as possible (including rejecting the armrests for being 2 inch’s too narrow) but would eventually tolerate them
Is this 707 or 701's?
I have it from a good source that there is much worry over the new cab size within bombardier and swr. We wait and see what happens. Those extra 4 seats behind the cab now seem to be causing a lot of headaches...
There aren't any extra seats. The passenger saloon space between the cab and the first doors is the same as on the 710s. The much more credible explanation is that the shorted cab allows the doors on a 2x5 car train to stop in exactly the same locations as for a 10 car unit.I have it from a good source that there is much worry over the new cab size within bombardier and swr. We wait and see what happens. Those extra 4 seats behind the cab now seem to be causing a lot of headaches...
There aren't any extra seats. The passenger saloon space between the cab and the first doors is the same as on the 710s. The much more credible explanation is that the shorted cab allows the doors on a 2x5 car train to stop in exactly the same locations as for a 10 car unit.
Anyway, back to 707s....
hopefully they wont need much training as the drivers based at Orpington/ Slade Green sign 700s too and I believe the cab/ driving controls are similar
It was only some Orpington drivers who signed 700s, and the ones that did haven’t for quite a while now. A full traction course will still be needed.
Hard to see why that's relevant - putting different cabs on the 10-car units just because they don't need to operate in multiple would be a bit expensive?Without wishing to totally derail this thread, the unit ASLEF looked at was a 10 car fixed length.
Pretty sure 10 coaches won’t fit into Brixton (amongst other stations on the Victoria metro routes)It would be most logical if the 707s were based out of a london terminus, e.g. Victoria as Slade green and orpington drivers sign 700s (I believe) and would be quite good to have a dedicated metro fleet for a set of routes out of a london terminus. just an idea
Yes many stations on between Victoria and Bromley South either via Catford or Herne Hill are 8 car only. Brixton has the added challenge that a train longer than 8 cars stopping at the down platform also obstructs the junction behind it, so SDO alone doesn't solve it.Pretty sure 10 coaches won’t fit into Brixton (amongst other stations on the Victoria metro routes)
One 707 is going to be released to Southeastern early for training purposes. They are going to be the last stock to be replaced though in the current plan.In response to the order at which the SWR trains were going to be replaced, originally it was going to be 458>707>455/456 but with the 701s being so delayed the 707s may well be heading off to SE first. As much as I enjoy travelling on them the 458s are in a terrible state with the majority of the blame on SWR. SWT managed to keep them alive but most units have broken windows, non functioning doors or cushions falling off seats. I'm sure SWR are in a great hurry to get rid of them but if the 701s keep on getting delayed then they may be forced to give up the 707s while the 458s are forced to keep going.
But surely if SE have already arranged for the transfers to occur on certain dates then SWR may be contractually obligated to release them, even if it would involve breaking their original order?One 707 is going to be released to Southeastern early for training purposes. They are going to be the last stock to be replaced though in the current plan.
With traffic levels considerably depressed currently but with the need to maintain capacity for social distancing these stock moves should be put on hold as there is no urgency for SE to receive them. The railway is essentially in govt control now and can make this happen but we desperately need a fat controller to lead from the front to ensure common sense prevails.But surely if SE have already arranged for the transfers to occur on certain dates then SWR may be contractually obligated to release them, even if it would involve breaking their original order?
One 707 is going to be released to Southeastern early for training purposes. They are going to be the last stock to be replaced though in the current plan.
With traffic levels considerably depressed currently but with the need to maintain capacity for social distancing these stock moves should be put on hold as there is no urgency for SE to receive them. The railway is essentially in govt control now and can make this happen but we desperately need a fat controller to lead from the front to ensure common sense prevails.
There is some logic to that but also a risk that drivers get trained and the trains don't come as quickly as expected and that training needs refreshing. The issue though is providing a reliable railway now that doesn't suffer capacity constraints that put people off travelling so my view remains that maintaining status quo is remains paramount over everything else. Rightly or wrongly SWR have clearly allowed the 458's to deteriorate and they now risk a shortage of serviceable stock for no real gain elsewhere. The 360's needed to be moved to EMT but GA bought in stood down units from elsewhere so no deficit was created nor a loss of capacity on GE services.Four
The urgency is the need for training or there will be a repeat of the GTR 700 introduction fiasco. If anything, now is the best time to start the training as there are more paths available and a higher availability of Drivers.
they'll be signed by orpington drivers (most likely) as they sign 700s which i believe aren't too dissimilar to 707s. they may just put them on Victoria metro services, so Victoria has a dedicated metro stock, but i have no ideaDo 707s have known service allocations yet for when they start passenger services? The belief is that as they currently have no toilets fitted they'll be doing similar to what 376s are doing.
Unfortunately what would make sense and what is contractually required are all too often not the same.With traffic levels considerably depressed currently but with the need to maintain capacity for social distancing these stock moves should be put on hold as there is no urgency for SE to receive them. The railway is essentially in govt control now and can make this happen but we desperately need a fat controller to lead from the front to ensure common sense prevails.
Perhaps not quite as simple as you suggest.they'll be signed by orpington drivers (most likely) as they sign 700s which i believe aren't too dissimilar to 707s. they may just put them on Victoria metro services, so Victoria has a dedicated metro stock, but i have no idea
It was only some Orpington drivers who signed 700s, and the ones that did haven’t for quite a while now. A full traction course will still be needed.
700s are totally different to 707s anyway. They have different software and quirks etc
I don't think they will be assigned to Victoria metro services, as they will be unable to stop at Brixton in the down direction in 10 coach formation as they will foul the junction for the Catford Loop Lines.they'll be signed by orpington drivers (most likely) as they sign 700s which i believe aren't too dissimilar to 707s. they may just put them on Victoria metro services, so Victoria has a dedicated metro stock, but i have no idea
There is some logic to that but also a risk that drivers get trained and the trains don't come as quickly as expected and that training needs refreshing. The issue though is providing a reliable railway now that doesn't suffer capacity constraints that put people off travelling so my view remains that maintaining status quo is remains paramount over everything else.
Perhaps not quite as simple as you suggest.
700s are totally different to 707s anyway. They have different software and quirks etc
I don't think they will be assigned to Victoria metro services, as they will be unable to stop at Brixton in the down direction in 10 coach formation as they will foul the junction for the Catford Loop Lines.