Good morning (all). Firstly I must apologise to norbitonflyer in particular for the tone of my earlier post (18,641). I was a little worse the wear, but that doesn't excuse the way it now comes across to me on re-reading it, so sorry

.
In very basic terms, yes, you are thinking along the correct lines, but in reality many diagrams will be reworked to match the passenger timetable, which would also involve other locations various. It is never as simple as eg; a Wimbledon depot to Dorking empty move, just starting back from Waterloo, as this could involve additional cost (driver/crew), as the driver booked to work from Wimbledon depot would need to 'pass' via Wimbledon station and up to Waterloo far earlier in the early a.m. than they would if signing on at Wimbledon depot.
The rediagramming of units, particularly when it involves changes to driver/guard duties, is a very complex procedure, not helped when the planners are given very strict financial limits to work to, as was the case in past times (pre SWR). I suspect now that we have GBR, the finances may have once again been restrained - the public purse and all that.
I can only base my assumptions on info in front of me, namely the latest CWN as mentioned, and my fast fading (in to the distance) knowledge of the old patch - which can be dangerous as I am not party to anything that is either ongoing or in the wings.
Therefore the following comments relating to ongoing/future events must not be taken as 'read', they are just my best guess. Past (pre 701) events are as they were, both planned and issued.
Should also be remembered that the current service level is reduced from that which applied in 2017. What the future timetable revamp (December 2027 as a guess?) will look like, we can only wait and see.
Wimbledon Depot Top Yard (for those unaware this is the Western part of the depot between Durnsford Road bridge and Wimbledon station, and is essentially for stabling and internal cleaning.
In the December 2017 CWN, issued under the SWR banner, but planned long before in SWT days, the above part of Wimbledon Depot included 15 departures, 10 out via Wimbledon station (head on run) and 5 that had to make a reversal move within depot limits, 4 of these going out to Waterloo via East Putney, and the last one going out via the exit at Durnsford Road (by the old staff Halt as was).
Of these 15 departures, 8 were diagrammed as 10 car. That matched exactly the number of stabling sidings that could (can) accommodate 10 car formations without fouling another siding.
By comparison, the latest (Leaf Fall) CWN for 2026 on the SWR website, indicates the total number of departures from this part of Wimbledon Depot has reduced to 6 trains, all of which are 10 car (701).
This has been helped by the reduced service to a small degree, but also aids flexibility within the overall depot for the need for storage space for a small number of 701/0 (total diagrammed is still 53), and the increasing number of 701/5's which will need to be on their home patch in the run up to passenger service introduction.
Whether any on the ground remodelling of some sidings is part of the ongoing plan (or not) I do not know, but there are possibilities in that regard which I have passed on to the appropriate people.
As said, it appears Waterloo International has now become an overnight stabling location, something it wasn't used for back pre covid. Can not now remember if this was considered in SWT days (in the planning sense), it may have been that NR's rules at that time, forbade stabling of trains overnight?
Overall, Waterloo platform stabling overnight has gone up from 10 platforms in December 2017, to 12 platforms as of now, including p21 to p24 inclusive. It should be remembered that NR take possession of approximately half of Waterloo most weekday nights for routine inspection and maintenance, hence the limit on stabling.