That would be everyone's ideal scenario, but having been involved in planning since BR days (now retired thankfully), line of route planning (as it was called) has a far greater cost implication, which is why that concept has, over the years, been given over to a more mixed interworking plan, which makes better overall use of the resources (stock and particularly crews) available from a ££ point of view. To be clear, this was/is (in my time) not something that was solely the preserve of the privatised railway. Think NSE days!I do hope the timetable refresh next year can massively reduce the amount of interworking across different routes and try to make as many routes as possible self-contained
Going forward, those in the hot seats will be juggling a fine line between public financing and service reliability.