As far as I recall, all of these 701s were taken to Long Marston by GBRF power (ie: a combination of 47/7, 57 and possibly 69s) none were taken by 37s. Their axle weight will be slightly different I suspect so the stress on the "bridge" will have been different. Incidently, we are calling this a "bridge" but I suspect it is really a culvert. The loss of the two 701/0s trapped should not be too serious to SWR at the moment as they have plenty of units already here "in the pipeline" for entry into service. Those at Farnham and Eastleigh are presumably just stabled "out of the way", and must be contenders for entry to service before they start to worry about the two stuck at Long Marston.
In terms of 701/0s, there's four January arrivals that haven't seen service yet. 007 or 006 might be close as ones doing the Clapham test runs recently. Plus another four which arrived in November or December that got jumped by other units. The units used for training courses presumably will mostly become available for commissioning when the conversion courses finish. This is without touching any at Eastleigh.
On the flip side for 701/5s could require a significant chunk of the fleet before they enter service. These are made up numbers, though hopefully plausible; if starting with 2 10-car diagrams that's 4 units, ideally would have 2 passenger service spares. Training might require another two pairs with a unit spare to rotate them round for maintenance. If the verification of the 701/5s with infrastructure/platforms isn't done for whole network upfront potentially would have another pair for that. In this example that would be 13 units for only 4 out in service. The quickest units from arrival at Wimbledon to passenger service has been 1.5 months and realistically would allow much more time as they won't all fly through perfectly.
I was present at Long Marston on February 4th, viewing from the road overbridge near to the entrance/exit to the site, when an attempt was made to move 701045 to Wimbledon.
Upon my arrival 701045 was located in the usual location, near to the entrance/exit for trains departing the site.
57306 arrived from Worcester and moved in front of the unit.
Following a lot of hi-viz activity the loco departed light engine from the site to Worcester around 3 hours later.
Therefore if 701045 is now trapped in any trapping must have taken place after the 4th. February.
Thanks for confirming. It would seem odd for both 045 and 049 to be trapped if 045 got to the gates two weeks ago. With the track changes for the test loop think most locos pick up/drop off just inside the gates with a resident shunter doing the rest within the site.
The 701s at Long Marston were mostly
side by side in the sidings end of last year. From front to back 007 (8th Jan), 519, 006 (14th Jan), 045, 008 (21st Jan), 509 (16th Feb) those with dates are arrivals at Wimbledon. The video was side on and the 701/5s would likely have another 701/5 coupled behind out of shot. Maybe 045 got put back somewhere else near 049 though seems unlikely a class 37 would venture that close to those sidings in such a short time frame.
It sounds more likely that SWR simply preferred to have the 701/5s with the 701/0 pipeline being healthy and 701/5 activities ramping up. Delays in getting enough 701/5s would have larger knock on impacts than 701/0s where increase in diagrams can be pushed back a week or two.