nothing is changing over next week from what I can see.Any news on when we are likely to see 701s take over some more of “their” diagrams which are currently being covered by other units
nothing is changing over next week from what I can see.Any news on when we are likely to see 701s take over some more of “their” diagrams which are currently being covered by other units
They need that nowI know we’ve only seen new diagrams this week but what’s a realistic timeframe for the next round?
Assuming that the driver training programme is continuing at pace surely they’ll need more services to be 701s in the near future.
Was hoping for at least one new diagram a week tbhnothing is changing over next week from what I can see.
Same here, but maybe it'll be a couple at a time every 2-3 weeks...Was hoping for at least one new diagram a week tbh
That would be a very rapid introduction compared to previous new fleets!Was hoping for at least one new diagram a week tbh
The things have been around since 2020, the last thing their introduction will ever be is rapid.That would be a very rapid introduction compared to previous new fleets!
That is of course true. I meant from now.The things have been around since 2020, the last thing their introduction will ever be is rapid.
One of the funniest comments I've read on here in years. Chapeau sirIt's been a spectacularly tantric introduction into service, hasn't it?![]()
I think one per fortnight is more realistic.Was hoping for at least one new diagram a week tbh
That would give us approx 20 diagrams by year end when I thought the internal target was 34.I think one per fortnight is more realistic.
And 20 would surely be incredibly slow.That would give us approx 20 diagrams by year end when I thought the internal target was 34.
Was hoping for at least one new diagram a week tbh
As more and more crew are trained the pool of usable crew increases, expect to see the initial increase start slow but ramp up over time. It becomes almost exponential in growth once the pool is large enough. I use the word almost. Not actually...I think one per fortnight is more realistic.
Yes, I recall the 450s. Started with a slow trickle then suddenly became a flood and it seemed they were everywhere overnight.As more and more crew are trained the pool of usable crew increases, expect to see the initial increase start slow but ramp up over time. It becomes almost exponential in growth once the pool is large enough. I use the word almost. Not actually...
Many diagrams won't start and finish at the same place requiring alterations to the diagrams and/or multiple to be brought in at once. Those sort of alterations are easier to do less frequently, particularly as week to week won't be massive change in driver availability. Fortnightly changes have been common on rollouts elsewhere.Was hoping for at least one new diagram a week tbh
That's what has been running, as well as fewer diagrams many run differently to the longer term plan. This post on the diagrams thread has the current diagrams based on what was running earlier this week. 2V53 is on a different diagram in the long term plan, but is used to shorten or balance another diagram.Oh - that's not what I had for Diagram 5, copied from a post up thread. has it been amended/corrected?
Sorry to disappoint anyone who might have thought this was something newThe latest cover of Modern Railways magazine has a panel about the 701s, and a rather worrying bullet point that states "455 life extension plans"![]()
This doesn't make much sense considering the positive news recently and the plan to get 30-ish in by Christmas, which would cover most of the 455s with the remaining being operated by 450s and 458s.
Has something else gone wrong?
It says "life extension to 2030" which I found a bit of a strange detail. Obviously they're not going to last that long..Sorry to disappoint anyone who might have thought this was something newbut it's not. It's reporting on the revised training programme, with the briefest of mentions about the Class 455 corrosion repairs.
Presumably the corrosion repair work is guaranteed for five years.It says "life extension to 2030" which I found a bit of a strange detail. Obviously they're not going to last that long..
Very impressive if it's maintained, but as Roger Ford has pointed out previously the average tends to fluctuate a lot with such a small operational fleet. Nevertheless, to date they've been at least as good as other Aventra fleets in the early days of introduction.701's reliability has gone up quite a bit since last December with the miles per major failure now sitting at 9k compared to 4k.
701055On Tuesday 20.05.25 5Q77 1617 Bicester to Willesden SWS forming 5Q77 1929 Willesden SWS ran hauled by 69008 - cetrainly conveying a 701 unit, but can anyone confirm which please?
Many thanks Alanc: I see that another is due from Bicester on 27/05, via the same arrangements.701055
HTH
Still a way off the contracted 45k target, though, and even further off the 458/0s (and indeed the slammers) at their peak.Very impressive if it's maintained, but as Roger Ford has pointed out previously the average tends to fluctuate a lot with such a small operational fleet. Nevertheless, to date they've been at least as good as other Aventra fleets in the early days of introduction.
Article in today’s Financial Times - mentions DfT - First Group ‘dispute’ re. the 701s: https://on.ft.com/4kzAfDq
Looks like SWR didn't let the DfT know about the negotiations with unions in January.In a sign of the tensions between the government and some owning groups, Alexander said she had inherited "an abject mess from the private operator", speaking at a depot in Bournemouth.
Only five of a fleet of 90 new "Arterio" trains are available, following delays in building the trains and a row with unions over their safe introduction, including whether drivers or guards should operate the doors.
The trains, built by Alstom in Derby, were meant to enter service by 2019.
Department for Transport officials have written to First Group to accuse it of not informing them about January negotiations with unions regarding the trains.
Yes 7 diagrams in passenger service at once, 9 units have been in passenger service over the last week.Only 5 available? Didn't we have 7 diagrams reported a few days ago?
Wonder when the DfT actually found out?Looks like SWR didn't let the DfT know about the negotiations with unions in January.