There's various different types of testing. It's plausible the Hounslow Loop trips are also being used for driver training where the conversion course often would require a certain amount of practical handling.One question regarding the testing of the trains: why are they only being tested on the Hounslow Loop? Presumably this is for fault-free testing + putting some miles on them, but since the 458/4s are already operating on that line, why would they do it there?
Since we don't know where they are planning to introduce the next diagrams, one can only assume this is just for the Windsor side, although the odd test trip to Hampton Court and Shepperton + Kingston Loop this week are promising signs for broader deployment soon, although we can't get our hopes up of course!
With the 707s leaving tomorrow, and the amount of shortened formations appearing, what with needing repairs, and sending off /5s for refurb, they surely have to introduce them on these lines soon, right?
More testing paths have appeared for early next week over more of the network. They are all "runs as required" so might not actually run. Next week has Shepperton again, Strawberry Hill depot, Wimbledon including fast line platforms, Hampton Court both platforms and Epsom. All late at night with dwells consistent with platform train interface style of testing though these sort of trips often don't stop everywhere scheduled.
