Class 701 'Aventra' trains for South Western Railway: progress updates

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,847
Location
SW London
Also should add that this a contract that was agreed before COVID. It's likely they're just fulfilling their side with Alstom. Take a look at the wording of the LinkedIn post
Not only was the contract agreed before COVID, but the fleet rollout should have been well under way - about halfway through - by the time lockdown started at the end of March 2020.
Direct extract from the First Group press release:

The new trains will start to come into service from mid 2019 and will all be in place by December 2020.
So it had already gone horribly wrong long before anyone had even heard of Covid.
Came across this post upthread, from 2017................
Try to keep up with events:roll: Since 2014 we've had a few thing s happen which everyone would have said would never happen:

  • Conversion of LU d-stock to DEMUs
  • Proposal of conversion of class 319s to DMUs
  • Class 442s returning to the SWTs
  • SWTs getting rid of the 458s (after conversions) and 455s (after re-tractioning)
  • Upcoming re-tractioning of the 442s

Just because something would never have happened in 2014, doesn't mean that it might not happen now;)
Most of it didn't!
 
Last edited:

43096

On Moderation
Joined
23 Nov 2015
Messages
18,892
Not only was the contract agreed before COVID, but the fleet rollout should have been well under way - about halfway through - by the time lockdown started at the end of March 2020.

So it had already gone horribly wrong long before anyone had even heard of Covid.
Indeed. Always worth reminding ourselves of the originally contracted timescales. The below table is taken from the SWR franchise agreements as originally signed.
1724698556855.png
 

3141

Established Member
Joined
1 Apr 2012
Messages
2,131
Location
Whitchurch, Hampshire
did it exist in printed form?
Details, though not necessarily all of them, were printed in reports about the new franchise in railway magazines. I think I still have the relevant issue of Modern Railways.

Draft timetables were published for consultation after the franchise had started. I downloaded some of them but not for the Windsor lines. They weren't all welcomed by the public, and from recollection First/MTR were engaging with the DfT about not going ahead with everything they had proposed.
 

NorthLondoner

Member
Joined
8 Jul 2021
Messages
28
Location
London
There's some information which can be found on an old thread. It included draft timetables for enhancements to the Windsor and Reading, Portsmouth Harbour via Guildford and Kingston stopping services. Only part of the changes were implemented to this day.

 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
The 707s reportedly have a very short amount of time left (going for inspection this Friday) - Good news presumingly as it means there's some sort of confidence the 701 rollout will start soon
 

Stephen42

Member
Joined
6 Aug 2020
Messages
810
Location
London
No 701 unit out again on a bank holiday, what exactly is stopping this?

I know for a fact its not crew related so what could it realistically be.
With an amended Saturday timetable the diagram usually worked by 701s doesn't exist. If it was an absolute priority they probably could have amended the diagrams to have a handful of services operated by a 701. It has limited value and the stock isn't stretched anywhere near as much on a Saturday timetable. Focusing on the wider rollout would be the priority as that would have bigger fleet usage impact than a single bank holiday.
People have been saying "soon" since January.
With driver training having started that's the last key blocker. With the 707s due to leave and the schedules having an additional 0752 Surbiton to London Waterloo Monday to Thursday at the end of next month everything suggests progress towards rollout.
 

Andy1673

Member
Joined
10 May 2019
Messages
947
With an amended Saturday timetable the diagram usually worked by 701s doesn't exist. If it was an absolute priority they probably could have amended the diagrams to have a handful of services operated by a 701. It has limited value and the stock isn't stretched anywhere near as much on a Saturday timetable. Focusing on the wider rollout would be the priority as that would have bigger fleet usage impact than a single bank holiday.

With driver training having started that's the last key blocker. With the 707s due to leave and the schedules having an additional 0752 Surbiton to London Waterloo Monday to Thursday at the end of next month everything suggests progress towards rollout.
This type of rollout is the slowest of all. Now we have only one morning diagram of 701 with the sole evening peak 2R53, we will have two diagrams of 701s one of which will be the sole 0752 Surbiton to Waterloo (if it will be served by 701). What a progress!
 
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
This type of rollout is the slowest of all. Now we have only one morning diagram of 701 with the sole evening peak 2R53, we will have two diagrams of 701s one of which will be the sole 0752 Surbiton to Waterloo (if it will be served by 701). What a progress!
This is just a theory but I think once we get the first new diagram they'll start appearing quicker. By December we should at least have another one on top of that, I assume
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,538
Given that a tranche of drivers complete their training every week, they'll need trains to drive, else they will need refresher courses!

== Doublepost prevention - post automatically merged: ==

Given that a tranche of drivers complete their training every week, they'll need trains to drive, else they will need refresher courses!
 

WrongRoad

Member
Joined
3 Nov 2017
Messages
108
Given that a tranche of drivers complete their training every week, they'll need trains to drive, else they will need refresher courses!

== Doublepost prevention - post automatically merged: ==

Given that a tranche of drivers complete their training every week, they'll need trains to drive, else they will need refresher courses!
Also there’s only a few 701’s cleared for passenger service at the moment, so drivers finishing their training some will have to go back and do refresher courses due to lack of stock and training on units that can be used.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,910
Location
London
I believe there is less than 8 701s actually passenger ready? But a tad more avaliable for driver training.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
There's some information which can be found on an old thread. It included draft timetables for enhancements to the Windsor and Reading, Portsmouth Harbour via Guildford and Kingston stopping services. Only part of the changes were implemented to this day.

It was also reported somewhere either in that thread, or the one it links to, that the Windsor 4 tph had already been removed, in favour of retaining the through trains to Weybridge. The original proposals had Weybridge reduced to being served by a shuttle between Weybridge and Staines. I guess that didn’t go down well at all, although I think it was a shuttle prior to 2004.

== Doublepost prevention - post automatically merged: ==

People have been saying "soon" since January.
But now there’s been a post in the SWR fleet withdrawals thread that they stop this Thursday.
 
Last edited:

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,910
Location
London
Only five have ever carried passengers in service (see post #9,000) - which are the other three?
I did mention "less" but also SWR don't actively rotate these units either. Pretty sure for example Unit 43 was doing most of the work till it developed a few faults and the next unit took over.

Between 6-8 of them are "Passenger ready" and just slightly a few more are Driver training ready. That I got from an internal source. Now how or when the rest of the units progress into the Passenger ready side and what exactly makes them fit this criteria is an internal question for SWR Operations.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
Between 6-8 of them are "Passenger ready" and just slightly a few more are Driver training ready. That I got from an internal source. Now how or when the rest of the units progress into the Passenger ready side and what exactly makes them fit this criteria is an internal question for SWR Operations.
And I'm sure that Bombardier (Alstom), SWR and Rock Rail won't just be sitting back and doing nothing about the other 80+ units.

As it is the whole of the Windsor service can be converted to 701 operation with 5 units.
 
Last edited:
Joined
2 Jun 2023
Messages
1,096
Location
Richmond
And I'm sure that Bombardier (Alstom), SWR and Rock Rail won't just be sitting back and doing nothing about the other 80+ units.
I think most people forget that in they're current state they're costing an awful lot of money to all parties involved and it's hardly in their interest for them to sit around doing nothing
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,847
Location
SW London
I did mention "less" but also SWR don't actively rotate these units either. Pretty sure for example Unit 43 was doing most of the work till it developed a few faults and the next unit took over.
Quite so - favourite at the moment is 039, which has done nearly all the work over the past two months, whilst 043 has only been out once since the beginning of July.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,287
Location
West Wiltshire
So what specific differences are there between a passenger ready 701 and a driver training one?
I was wondering that too, especially if operated as Driver only when empty when everything like doors and passenger info screens (showing not in service) need to work

What about guard training, is that on passenger ready version ?

I might have misunderstood, but I got impression the units that had been modified at Eastleigh, done their acceptance mileage and were moved to store were supposed to be be ready to use.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,910
Location
London
I'd assume it's various tests that have to be conducted especially for those that have been stored for so long. Checking the various passenger safety systems like Egresses, and alarms are still in decent working condition.

Passenger Confort systems like the AC, displays etc are again all working to acceptable standard. There'd be some criteria or tick boxes, with Driver training only units only having a few less criteria than full service, passenger ready units.
I was wondering that too, especially if operated as Driver only when empty when everything like doors and passenger info screens (showing not in service) need to work

What about guard training, is that on passenger ready version ?

I might have misunderstood, but I got impression the units that had been modified at Eastleigh, done their acceptance mileage and were moved to store were supposed to be be ready to use.
 

Bigfoot

Established Member
Joined
2 Dec 2013
Messages
1,425
As it is the whole of the Windsor service can be converted to 701 operation with 5 units.
But not simply, 5 units come from different depots, having enough crews trained to cover the whole of every diagram every day requires a significant number of crew trained on the stock. Also it is frowned upon and not good practice to have the same crews working the same diagrams day in day out.

If you say there are 30 trips to and from Windsor from Waterloo per day (half hourly for 15 hours):

Each driver doing 2 return trips (not uncommon in a diagram but most will do 1 and then other work along side that). I'm sure there are rules of dco and non dco mixed diagrams that I can't recall so we will gloss over that.

That is 15 drivers. working an average of a 4 day week you now need 30 to guarantee cover every day (Monday to Saturday) providing that their roster pattern line up perfectly. Probably more like 40-50 to cover for holiday, other workplace training, sickness etc.

Now factor in the positioning moves from depots to starting station and that there are more than 30 trips.

I haven't even mentioned guards.

It's so much further away from a simple oh it's only 5 units.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,235
But not simply, 5 units come from different depots, having enough crews trained to cover the whole of every diagram every day requires a significant number of crew trained on the stock. Also it is frowned upon and not good practice to have the same crews working the same diagrams day in day out.

If you say there are 30 trips to and from Windsor from Waterloo per day (half hourly for 15 hours):

Each driver doing 2 return trips (not uncommon in a diagram but most will do 1 and then other work along side that). I'm sure there are rules of dco and non dco mixed diagrams that I can't recall so we will gloss over that.

That is 15 drivers. working an average of a 4 day week you now need 30 to guarantee cover every day (Monday to Saturday) providing that their roster pattern line up perfectly. Probably more like 40-50 to cover for holiday, other workplace training, sickness etc.

Now factor in the positioning moves from depots to starting station and that there are more than 30 trips.

I haven't even mentioned guards.

It's so much further away from a simple oh it's only 5 units.
You've misunderstood me.

The comments I was responding to were in relation to there only being 6-8 units currently available. I pointed out that the whole of the Windsor service requires just 5 units. I made no mention of crewing, which by the way, I fully understand the logistics of as you've outlined.
 

dave6

Member
Joined
19 Aug 2014
Messages
13
Hi
Came past Wimbledon depot yesterday and 'spied' 3 x 701's stabled in the running shed nearest the station.
Does anyone have intel as to which they might be.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,255
Location
UK
But not simply, 5 units come from different depots, having enough crews trained to cover the whole of every diagram every day requires a significant number of crew trained on the stock
Probably more like 40-50 to cover for holiday, other workplace training, sickness etc.
Now factor in the positioning moves from depots to starting station and that there are more than 30 trips.
Well said, and glad to see that the 'planning/'rostering'' aspect is appreciated. Back in my day it was often difficult to get such points across, and that was often to 'other' in house departments...let alone non industry people!
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,840
Location
Croydon
But not simply, 5 units come from different depots, having enough crews trained to cover the whole of every diagram every day requires a significant number of crew trained on the stock. Also it is frowned upon and not good practice to have the same crews working the same diagrams day in day out.

If you say there are 30 trips to and from Windsor from Waterloo per day (half hourly for 15 hours):

Each driver doing 2 return trips (not uncommon in a diagram but most will do 1 and then other work along side that). I'm sure there are rules of dco and non dco mixed diagrams that I can't recall so we will gloss over that.

That is 15 drivers. working an average of a 4 day week you now need 30 to guarantee cover every day (Monday to Saturday) providing that their roster pattern line up perfectly. Probably more like 40-50 to cover for holiday, other workplace training, sickness etc.

Now factor in the positioning moves from depots to starting station and that there are more than 30 trips.

I haven't even mentioned guards.

It's so much further away from a simple oh it's only 5 units.
Once critical mass for staffing Windsor is achieved would it be likely that adding other routes starts to get easier ?.
I assume then the number of 701s available would have to increase so we will ony then begin to see how ready for action further 701s are.

And all this has to happen quick enough that drivers' competency does not lapse.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,183
Location
Ashford Middx
What routes do drivers who cover Windsor diagrams typically sign? Or does it vary hugely?

Just wondering, for example, if there are enough drivers for Windsor trained on 701's would that make it easier to introduce them on Weybridge via Hounslow services too because the same drivers sign all routes on the Windsor side? I am guessing it won't be that simple..
 

SWR_DRIVER

Member
Joined
18 Jul 2018
Messages
93
Location
London
What routes do drivers who cover Windsor diagrams typically sign? Or does it vary hugely?

Just wondering, for example, if there are enough drivers for Windsor trained on 701's would that make it easier to introduce them on Weybridge via Hounslow services too because the same drivers sign all routes on the Windsor side? I am guessing it won't be that simple..
To my knowledge, any train crew that signs Windsor will also sign Weybridge via Hounslow. However, drivers that do these routes don't necessarily also sign Reading. Also various stabling points along the Windsor side may also not be part of a driver's route knowledge...
 