OneTrackMinded
Member
Behold, the surprisingly very similar acceleration of the 345 and 701.
345 is about 204.73m long while the 701 is about 203.11m long.
(different carriage lengths hence why 9 cars on the 345 is slightly longer than 10 on the 701)
Keep in mind, one of these is on 25kV, while the other is on 750V Third Rail!
For those interested in the actual stats:
- The 701 clears its length in 22 seconds and 466 milliseconds. This means it's travelling at approximately 40.45mph.
- The 345 clears its length in 22 seconds. This means it's travelling at approximately 41.72mph.
- Difference of only 1.02mph..!
On average we're looking at anywhere from 1-2mph difference
(Red line represents starting point. 345's one is slightly too forgiving however the calculations themselves are correct)
(Before anyone asks, the 345 is at full throttle as it's on an ATO section)
345 is about 204.73m long while the 701 is about 203.11m long.
(different carriage lengths hence why 9 cars on the 345 is slightly longer than 10 on the 701)
Keep in mind, one of these is on 25kV, while the other is on 750V Third Rail!
For those interested in the actual stats:
- The 701 clears its length in 22 seconds and 466 milliseconds. This means it's travelling at approximately 40.45mph.
- The 345 clears its length in 22 seconds. This means it's travelling at approximately 41.72mph.
- Difference of only 1.02mph..!
On average we're looking at anywhere from 1-2mph difference
(Before anyone asks, the 345 is at full throttle as it's on an ATO section)
Last edited: