Depends on trailing weight but 1200 tonnes for a class 4, 75C66S12 and anything for a class 6 from 800 tonnes to 2200.
we were talking about this the other night a freight was dropping time, looked at TRUST it was 32 loaded, with 1900 tonnes Class 4 FOCs cheating with more tonnage than they should. It also puts pressure on the ibfrastructure as these trains are usally longer than they should be and as such there can situations where trains are scheduled in wait in loops but being over length no longer fit.
Freights won't run overlength unless authorised by Network Rail. Not being able to fit in loops doesn't necessarily mean it's overlength in the true sense of the word.
Freights won't run overlength unless authorised by Network Rail. Not being able to fit in loops doesn't necessarily mean it's overlength in the true sense of the word.