Brunel
Member
- Joined
- 1 Nov 2012
- Messages
- 63
Rail Technology Magazine said:Network Rail is speeding up its ability to rescue failed electric multiple units with specially adapted Class 57s.
The rescue trains’ brake interface units have been modified to allow drivers to operate their own brakes and those of the failed train together. The train can also operate the safety interlocks, allowing broken-down units to be removed at normal line speed. This means rescues can be completed in 15 minutes.
The Class 57s will also routinely move EMUs between works for servicing.
http://www.railtechnologymagazine.com/Rail-News/class-57s-modified-for-faster-rescue