37254
Member
I have found this schedule on RTT (Which I believe to be the 50s, correct me if I'm wrong) which was scheduled to go to Eastleigh east yard, and then continue on on Tuesday to Kidderminster. It was cancelled at Bristol temple meads (http://www.realtimetrains.co.uk/train/R03953/2019/04/15/advanced) Due to a "Train crew problem" But then formed a new schedule immediately after (well, when I say after I really mean before, as it left 15 seconds earlier than the original schedule got in?) http://www.realtimetrains.co.uk/train/O98936/2019/04/15/advanced . The timing load is very weird compared to the other one. "High Speed Train (HST125)" and if there was a train crew issue then how come it formed a new service that went to the same place? Does anybody know the real reason it got cancelled and why is is showing as a HST?