Can/could the 442 driving coaches be used on Chiltern loco hauled services replacing the DVTs currently used, it would increase capacity with out increasing the number of vehicles in a train which I believe I read somewhere was an issue with increasing train lengths for that operator?
i suggest you read post #146
I don't believe that the cost of conversion of the class 442 coaches would be any different than converting the existing HST coaches and I actually expect that it would be less to be honest.
I don't believe that the cost of conversion of the class 442 coaches would be any different than converting the existing HST coaches and I actually expect that it would be less to be honest.
It has been pointed out that there is a lot that is different. All of which would need to be altered to make these coaches compatible with HSTs. None of which have been done before, so the cost would be unknown. With Doreen (2016 - and yes I know she has been denamed but she carried that name for many years) having unique air conditioning that is powered directly from the 750V bus, there would be even more modification to make it compatible with 415V 3 phase AC. This is on top of a general refurb.
Existing HST coaches would possibly need the door mods to Chiltern spec (it is not essential as adapting the current doors is feasible under PRM-TSI) and a general refurb. All of which are now known in terms of cost and labour.
I strongly suspect that it would be a lot cheaper to modify HST coaches to the new spec. There will be many released when HSTs transfer to Scotrail, so they would have plenty to choose the best from.
My last point. 25 2+5 sets would give a problem. There are only 24 5 car sets of 442s. Meaning there would be an odd set. The last thing any rail operator would want.
Not all Mk3's are built the same. (Some would say no two Mk3's are built the same!But I am not saying that you do not convert some of the existing HST carriages, what I am saying though is that project can surely begin with using the Mk3 carriages from the class 442's , as I suspect that the cost to convert and refurbish the 442's is not going to be different to the rebuilding work on the HST Mk3's to Chilternise them.
)But I am not saying that you do not convert some of the existing HST carriages, what I am saying though is that project can surely begin with using the Mk3 carriages from the class 442's , as I suspect that the cost to convert and refurbish the 442's is not going to be different to the rebuilding work on the HST Mk3's to Chilternise them.
To make them compatible with HSTs, they will need.
A complete rewire, (2016 would also need a new air conditioning system.)
Complete braking system change from the SR EP/Westinghouse system to the standard system used on Mk3s
Possibly a bogie change to BT10s (certainly the MLC will require new bogies)
Removal of all old traction gear
New couplings throughout.
Potential for Chilternising the doors (necessary if they want to match to existing Mk3s if they have been converted.)
Full refurb to ASR standards.
Whereas HST stock will need
Door modifications (possibly Chiltern style, possibly revised slam door)
Full refurb to ASR standards.
I know for a fact which one is going to be a lot cheaper.
To make them compatible with HSTs, they will need..
I'm still surprised we hardly ever get proposals to turn redundant HSTs into 442s.in short, maybe the body shell itself can be reused...
I'm still surprised we hardly ever get proposals to turn redundant HSTs into 442s.
Surely you'd just have to... /contd p94
in short, maybe the body shell itself can be reused...
I'm still surprised we hardly ever get proposals to turn redundant HSTs into 442s.
Surely you'd just have to... /contd p94
Stop! No! It's bad enough we have 442s as the cure all for pretty much every single issue on the network we're not going the other way as well I forbid it!
![]()
Talking of going the other way, we haven't looked at the option of turning baked bean tins into 442s!!
Bar couplings between coaches, smaller plug doors, no buffers on the inner ends, different bogies, triple valves instead of distributors, smaller plug doors, 27 way multiple working jumpers not AAR
thats just a few differences, they were built as a multiple unit and not as loco hauled stock. The conversion to loco hauled stock would probably be prohibitively expensive. However the conversion to razor blades or cat food cans would be very cheap indeed.
But they are already loco hauled stock, just so long as the loco is a class 33/1 or a class 73/0 or 73/1.
Where can we find some of those? Probably rotting in a siding somewhere in Scotland soon, once Serco see the error of their ways in butchering their 73s and making them do things they were never meant to do in a strange foreign land.
None of you noticed my deliberate mistake. All 442s are 24XXso 2416 is Doreen which would need the new air con system.
Do you represent ASLEF? :roll:
... its about time the south got some cast-off trains.
No railway union affiliation I'm afraid, but I am a fully paid up member of the union of rail users who can't understand why each time new rolling stock is needed, it has to be slightly different and slightly more complicated electronically than the last lot, and why perfectly adequate stock is consigned to the scrapyard because the bean-counters at the leasing companies can't use them screw a quick buck out of the TOCs.
What we've ended up with are shoddily-built trains, using the cheapest specified parts the builders can get away with that in some cases look superficially identical, but can't work in multiple because of needless changes to the computer software and can't be rescued or hauled easily by a rescue locomotive without costly modification to the loco. This is most recently represented by the Class 170s relinquished by Scotrail to Southern that can't yet work in multiple with Southern's 170s because they have different couplings. What genius thought the random mish-mash of trains we have now was a good idea?
Take the 442s, add a class 33/1 at each end and run them over the S&C where tourists can enjoy the views through lovely big windows without the endless racket of a soulless diesel generator beneath each coach. The displaced 158s and 156s can then be used elsewhere. My suggestion would be to put the displaced Sprinters to good use on the London Bridge - Uckfield line, its about time the south got some cast-off trains.
No railway union affiliation I'm afraid, but I am a fully paid up member of the union of rail users who can't understand why each time new rolling stock is needed, it has to be slightly different and slightly more complicated electronically than the last lot, and why perfectly adequate stock is consigned to the scrapyard because the bean-counters at the leasing companies can't use them screw a quick buck out of the TOCs.
What we've ended up with are shoddily-built trains, using the cheapest specified parts the builders can get away with that in some cases look superficially identical, but can't work in multiple because of needless changes to the computer software and can't be rescued or hauled easily by a rescue locomotive without costly modification to the loco. This is most recently represented by the Class 170s relinquished by Scotrail to Southern that can't yet work in multiple with Southern's 170s because they have different couplings. What genius thought the random mish-mash of trains we have now was a good idea?
Take the 442s, add a class 33/1 at each end and run them over the S&C where tourists can enjoy the views through lovely big windows without the endless racket of a soulless diesel generator beneath each coach. The displaced 158s and 156s can then be used elsewhere. My suggestion would be to put the displaced Sprinters to good use on the London Bridge - Uckfield line, its about time the south got some cast-off trains.
No railway union affiliation I'm afraid, but I am a fully paid up member of the union of rail users who can't understand why each time new rolling stock is needed, it has to be slightly different and slightly more complicated electronically than the last lot, and why perfectly adequate stock is consigned to the scrapyard because the bean-counters at the leasing companies can't use them screw a quick buck out of the TOCs.
What we've ended up with are shoddily-built trains, using the cheapest specified parts the builders can get away with that in some cases look superficially identical, but can't work in multiple because of needless changes to the computer software and can't be rescued or hauled easily by a rescue locomotive without costly modification to the loco. This is most recently represented by the Class 170s relinquished by Scotrail to Southern that can't yet work in multiple with Southern's 170s because they have different couplings. What genius thought the random mish-mash of trains we have now was a good idea?
Take the 442s, add a class 33/1 at each end and run them over the S&C where tourists can enjoy the views through lovely big windows without the endless racket of a soulless diesel generator beneath each coach. The displaced 158s and 156s can then be used elsewhere. My suggestion would be to put the displaced Sprinters to good use on the London Bridge - Uckfield line, its about time the south got some cast-off trains.
If I was SWT I'd want some the 442s back and run them on the long distance services that the 450s currently run, like the Pole stopper and Portsmouth Direct. Move those 450s to the outer/inner suburbans to lengthen any trains that need being 12 cars. It could have been a stop gap until the 707s are delivered.
No railway union affiliation I'm afraid, but I am a fully paid up member of the union of rail users who can't understand why each time new rolling stock is needed, it has to be slightly different and slightly more complicated electronically than the last lot, and why perfectly adequate stock is consigned to the scrapyard because the bean-counters at the leasing companies can't use them screw a quick buck out of the TOCs.
What we've ended up with are shoddily-built trains, using the cheapest specified parts the builders can get away with that in some cases look superficially identical, but can't work in multiple because of needless changes to the computer software and can't be rescued or hauled easily by a rescue locomotive without costly modification to the loco. This is most recently represented by the Class 170s relinquished by Scotrail to Southern that can't yet work in multiple with Southern's 170s because they have different couplings. What genius thought the random mish-mash of trains we have now was a good idea?
Take the 442s, add a class 33/1 at each end and run them over the S&C where tourists can enjoy the views through lovely big windows without the endless racket of a soulless diesel generator beneath each coach. The displaced 158s and 156s can then be used elsewhere. My suggestion would be to put the displaced Sprinters to good use on the London Bridge - Uckfield line, its about time the south got some cast-off trains.