If the class 43 had no mk3s could it go even faster than 125 mhp?
HST power cars were reclassified as locos, Class 43, away back in the 1990sClass 43's were 90 mph diesel hydraulics, 125 would never have worked.
As for the HST Power Cars
IIRC, isn't a set only permitted to travel at full line speed with a minimum of 5 Mk3's? I seem to recall reading this in the Grand Central thread, in the early days when there were reliability issues with some of the coaches. Services had to be caped because they couldn't short form a set as it wouldn't keep to timed paths with the restricted speed.
Just had a quick look and am sticking with 5 coaches as a minimum. Any record runs, i.e the diesel record on the ECML and even the recent FGW Plymouth run were with five Mk3's.
Limited to 110mph they should be able to keep to time, given the lighter train load and timetable padding / allowancesThere are some GC sets running around with 4, and they manage to keep time?
HST power cars were reclassified as locos, Class 43, away back in the 1990s
The speed limit when moving power cars from Craigentinny to Edinburgh Waverley was 60mph
When a loco was hauling a dead power car the speed limit was 45mph
Grand Central HST sets regularly operate as 2 + 4 formations at 125 mph. The issues in the early days were around the inexperience of the company, the uncertainty of the LHCS to HST conversion on the trailers and the obvious issues of unreliability, all of which have been dispelled over time.
GC HST's don't regularly run 2+4's, 2+5's and 2+6's are the norms, with 2+7's making irregular appearances. However, at the moment, due to coaches at Kilmarnock for repaint and work, 2 HST's are running as 2+4.
I'm sure Hydro has mentioned this on a thread about the NMT, mentioning that due to the number of braked axles present on the train, it gets restricted to a certain speed.
The record for a HST full set is 156mph.