That would seem utterly crazy to have to go all the way back to Japan just to get repaired. Can they seriously not carry out repairs in this country. We have dozens of rail repair and maintenance facilities and even Hitachi have a factory in this country now. Sending it all the way to Japan for a repair is bonkers.That was the unit that derailed at Ramsgate still awaiting repair. I'm guessing they're considering sending it back to Japan for repairs if it's there.
From what i have reliably been told, yes, Japan is the destination.That would seem utterly crazy to have to go all the way back to Japan just to get repaired. Can they seriously not carry out repairs in this country. We have dozens of rail repair and maintenance facilities and even Hitachi have a factory in this country now. Sending it all the way to Japan for a repair is bonkers.
True, but maybe if the damage is unique or incredibly specific then Hitachi might want to use it as a learning curve/teaching lesson themselves. Unlikely I agree, and surely cheaper to fly Hitachi staff to look at the unit in the UK, but the railway works in mysterious ways.That would seem utterly crazy to have to go all the way back to Japan just to get repaired. Can they seriously not carry out repairs in this country. We have dozens of rail repair and maintenance facilities and even Hitachi have a factory in this country now. Sending it all the way to Japan for a repair is bonkers.
They can’t send it by road or rail to Eastleigh due to Campbell Road outside of Arlington having a bend too tight for low-loadersThought it was bound for Eastleigh??
Oh wow ok. ThanksThey can’t send it by road or rail to Eastleigh due to Campbell Road outside of Arlington having a bend too tight for low-loaders
Allegedly they need the original jig for the repairs, which is still in Japan, and it's easier to send the unit to the jig and staff than send them to the unit.True, but maybe if the damage is unique or incredibly specific then Hitachi might want to use it as a learning curve/teaching lesson themselves. Unlikely I agree, and surely cheaper to fly Hitachi staff to look at the unit in the UK, but the railway works in mysterious ways.
Allegedly they need the original jig for the repairs, which is still in Japan, and it's easier to send the unit to the jig and staff than send them to the unit.
Source?From what i have reliably been told, yes, Japan is the destination.
Indeed. If it was low-loaderable it might have gone straight there. But why not from Southampton by rail?They can’t send it by road or rail to Eastleigh due to Campbell Road outside of Arlington having a bend too tight for low-loaders
There is a video in post #125 of the Ramsgate crash thread of them leaving Ramsgate on low loadersPresumably we are only talking about the two cars here - not the whole unit. But how did the two cars get to Southampton, surely not by rail ? But they have been put back on rail, even if moved by road. Usually these sorts of things would be shipped on a flat deck container or sledge type thing with wheels, then they would just be pulled onto one of the big ro-ro ships that link various ports around the world on a planned (timetabled) basis.
No, it was repaired at a specialist company in Derby.Other than the obvious damage at the front, what other damage has occurred to require it to be sent back to Japan?
Also, on a similar note, was the 800 that got too close to an HST in Leeds a few years ago which had similar looking damage sent to Japan or was that repaired by Hitachi here?
some sources can't be named! Just trust people!Some rather wild sounding suggestions on here.
Source?
We'll see how that goes then.some sources can't be named! Just trust people!
We will!We'll see how that goes then.
This isn't a peer reviewed journal. People can share information they have without the requirement to provide chapter and verse on where they obtained it. It is up to you whether you choose to believe it or not.We'll see how that goes then.
If indeed it is returning to Japan because they need to use the building jigs - this sounds quite serious and an extensive repair. Use of the jigs could indicate a new carriage body or indeed new replacement sections. Surely they could have made the bits required in Japan and sent them to the UK to be fitted, but I suppose it is a case of let the experts sort it out !
No, not at all. The train was shunting at a low speed in a siding. Bizarre that it's deemed damaged enough to be shipped to the other side of the world for repairs.was it a high(ish) speed incident
In the past stock has been offloaded in the East Yard and then moved from there into the works.They can’t send it by road or rail to Eastleigh due to Campbell Road outside of Arlington having a bend too tight for low-loaders
Point of note - it’s into the Arlington works, not the TRSMD. Hitachi will be squeezing it in between the IET work.I'd heard an access issue into Eastleigh depot, so we're awaiting movement by rail instead.
If they were to go back to Japan they would not have been re railed and reformed. They would have stayed on the trailers for onwards shipping.
I'd heard an access issue into Eastleigh depot, so we're awaiting movement by rail instead.
If they were to go back to Japan they would not have been re railed and reformed. They would have stayed on the trailers for onwards shipping.
Point of note - it’s into the Arlington works, not the TRSMD. Hitachi will be squeezing it in between the IET work.
Thank you. Yes, SETrains in post #7 above explained the road access issue and I do recall from a visit some years ago it's a bit interesting with corners and gradients although possibly not insurmountable using another route as Ciderking in post #25 suggests, depending on its destination on site. Given the unit was recovered from the siding from which it came to grief into Ramsgate depot by rail, the distance from where it is now into Eastleigh works isn't outrageous. To answer Rob F in post #19 and Mr Ainsworth's point in post #20, indeed it's not appropriate to post contract details on here, however I don't recall any mention or possibility of it being subbed out overseas but I could have another read.That makes much more sense.
Otherwise, why would vehicles hauled on a low-loader from Ramsgate be re-railed at Southampton QE2 Terminal, for them then to be put back on another low-loader to get them quayside to be loaded by crane onto a ship to go to Japan? Makes no sense. Eastleigh.