That's a relief Jonathan, thanks!

I have deliberately timed a visit to Reading to ride a 387 there before the invasion of the class 345s on the current Heathrow Connect service. I want my first 345 to be on a new section of CrossRail or maybe the short-lived service to the Liverpool Street terminus.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Non Multi

Member
Joined
11 Dec 2017
Messages
1,190
... I have deliberately timed a visit to Reading to ride a 387 there before the invasion of the class 345s on the current Heathrow Connect service. I want my first 345 to be on a new section of CrossRail or maybe the short-lived service to the Liverpool Street terminus.
I rather enjoyed going west of Reading on the 387s. I'd actually recommend a ride on a 165 stopper beforehand just to understand how much of an improvement they are.

IIRC, there will still be trains terminating in the peaks (6tph) at Liverpool St (high level) when the Crossrail route is fully operational.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
I rather enjoyed going west of Reading on the 387s. I'd actually recommend a ride on a 165 stopper beforehand just to understand how much of an improvement they are.

IIRC, there will still be trains terminating in the peaks (6tph) at Liverpool St (high level) when the Crossrail route is fully operational.

Oh, you mean there will still be a peak-hour service of 345s into Liverpool Street high level?
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,190

MatthewRead

On Moderation
Joined
21 Nov 2014
Messages
1,643
Location
West london
There simply aren't enough Turbos at Reading for the Didcot Parkway services you refer to not to be 387s.

Thinning of service on Good Friday looks like its due to two track railway through Twyford and Maidenhead (reliefs open, mains shut).
What about the rest of that weekend?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
What about the rest of that weekend?

I suspect that the timetables in RTT are currently wrong for the rest of the Easter weekend as there is some block at Bristol yet trains are still shown as going there.

http://www.nationalrail.co.uk/service_disruptions/116354.aspx/?nreTrack=engineering#Bristol
https://www.gwr.com/travel-updates/planned-engineering

However, the point remains that GWR *have* to use 387s to provide the stopping service out of Paddington. They don't have enough of any other kind of rolling stock.
 

Jpeg

Member
Joined
9 May 2017
Messages
44
That's correct, it's either going to be 4 or 6tph (although everything is still subject to last minute changes etc).
The latest proposed frequency diagram: https://cdn.londonreconnections.com...quency-including-Liv-St-peak-only-service.png
The LR article: https://www.londonreconnections.com/2017/one-of-the-family-crossrails-transition-to-being-a-tube/
What is going to happen to the current 387 non stopping services from Maidenhead and Slough once the 345s start running. It would make sense to transfer them to the Elizabeth line?
 

Siemens Staines

Established Member
Joined
30 Jul 2015
Messages
1,478
Last weekend there was a two track railway for some sections of the line between Paddington and Reading. This also reduced the stopping service to 2tph but only alternate services ran through to Didcot (all stoppers were pairs of 387). The gap in the service west of Reading was filled by extending alternate Oxford - Didcot shuttles through to Reading. This only increased the number of turbos to be used on the shuttles from three to four and was balanced by the fact that the two track railway caused all Bedwyn - Paddington trains to terminate at Reading reducing the number of units on that circuit from three to two. The Bedwyn trains (and likewise the Cheltenham Spa hsts) rarely run through to Paddington when there is a reduction in the number of available paths east of Reading.

I would have thought that this alteration would apply whenever there is two track railway east of Reading although I recognise that the precise locations of the engineering work will affect this.
 
Last edited:

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
What is going to happen to the current 387 non stopping services from Maidenhead and Slough once the 345s start running. It would make sense to transfer them to the Elizabeth line?

No it wouldn't, as most of them already run fast on the main lines east of Maidenhead, not the relief lines. That will not be changing.

Crossrail is designed to be a frequent all-stations service on the relief lines and, as such, doesn't allow for fast services sharing the same tracks.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
Last weekend there was a two track railway for some sections of the line between Paddington and Reading. This also reduced the stopping service to 2tph but only alternate services ran through to Didcot (all stoppers were pairs of 387). The gap in the service west of Reading was filled by extending alternate Oxford - Didcot shuttles through to Reading. This only increased the number of turbos to be used on the shuttles from three to four and was balanced by the fact that the two track railway caused all Bedwyn - Paddington trains to terminate at Reading reducing the number of units on that circuit from three to two. The Bedwyn trains (and likewise the Cheltenham Spa hsts) rarely run through to Paddington when there is a reduction in the number of available paths east of Reading.

I would have thought that this alteration would apply whenever there is two track railway east of Reading although I recognise that the precise locations of the engineering work will affect this.

Last weekend's engineering work forced the closure of the up main and down relief between Slough East and Acton. As a result, neither the Hayes shuttles or Heathrow Connect could run with the Reading / Didcot stoppers having to stop at Southall and no service at Hanwell, West Ealing and Acton Main Line. It was noticeable that while the down service was every 30 minutes, the up service in Saturday had a 15/45 minute gap over the restricted section.

If the lines west of Slough are shut, there are fewer stations to serve on the two-track stretch so perhaps it is easier to run two Didcots 30 minutes apart rather than a Didcot and a Reading on irregular spacing in each hour.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
What about the rest of that weekend?

Where the Easter plot thickens I that, even according to the GWR website, there are 4 trains an hour from Twyford (and presumably Reading) to Paddington on the Saturday. I therefore prefer to ride a 387 then when I shall see them more often!
 

MatthewRead

On Moderation
Joined
21 Nov 2014
Messages
1,643
Location
West london
Where the Easter plot thickens I that, even according to the GWR website, there are 4 trains an hour from Twyford (and presumably Reading) to Paddington on the Saturday. I therefore prefer to ride a 387 then when I shall see them more often!
I meant are there any closures at the eastern end near Paddington?
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,735
Almost there, two still to arrive at Reading.

387160 is expected on 25/01.
387174 date TBC.
387160 is being held at Bletchley as a mate to pair with 387174 for its testing. On that basis I would expect delivery to GWR to be at the same time.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E
387160 is being held at Bletchley as a mate to pair with 387174 for its testing. On that basis I would expect delivery to GWR to be at the same time.

We’ve already been notified of the 160 move, no mention of 174.
 

Bessie

Member
Joined
30 Oct 2017
Messages
280
So in the last week I've been on a class 345 out of Liverpool Street to Stratford and today I had my first taste of a class 387 from Reading to Maidenhead. I've always liked Electrostars with 2+2 seating on the Brighton line and the 387's are top notch. I can't say the same about the 345's. I know their main purpose is to act as pseudo LU stock on Cross-Rail but in 2 year's time when the Elizabeth Line is fully open I can see some Thames Valley commuters being shocked about the down-grading of their stock. It reminds of the time in the late 80's when Thameslink first came to the Brighton line and my first experience of sitting in a class 319 was akin to sitting on a very low-slung toilet. The difference between those seats and the big and bouncy seats on the CIGs (especially the earlier build ones) was a shock but hey that's progress!
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,843
Location
UK
I like the colour scheme of the 345s. Quiet dark and cosy, but not so dark as to make you feel unsafe.

But, I've not been on one in crowded conditions and I think the ambience won't count for much if people are uncomfortable or don't have enough things to hold on to.

Nor will they be forgiving if they suffer lots of faults, as given the number of people these trains will shift, disruption is going to be along the same lines as when the Thameslink core goes tits up.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
So in the last week I've been on a class 345 out of Liverpool Street to Stratford and today I had my first taste of a class 387 from Reading to Maidenhead. I've always liked Electrostars with 2+2 seating on the Brighton line and the 387's are top notch. I can't say the same about the 345's. I know their main purpose is to act as pseudo LU stock on Cross-Rail but in 2 year's time when the Elizabeth Line is fully open I can see some Thames Valley commuters being shocked about the down-grading of their stock. It reminds of the time in the late 80's when Thameslink first came to the Brighton line and my first experience of sitting in a class 319 was akin to sitting on a very low-slung toilet. The difference between those seats and the big and bouncy seats on the CIGs (especially the earlier build ones) was a shock but hey that's progress!

Passengers using the Thames Valley inner-suburban services have had years of being crammed into short Turbo formations - almost anything would look like an improvement on that.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
5Q74 just passed through Acton yard, ROG 37 and I think it was 387160 but I might be wrong. But it was just the one unit.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Have to say they're settling in nicely all things considered. Making good time too, I just got one from pad to rdg and we were early at almost every stop - notably from Ealing to Southall, did it in 4 mins of the booked 9. I'm guessing these timings are still a bit liberal though at the moment?
 

TwistedMentat

Member
Joined
2 Oct 2016
Messages
151
Have to say they're settling in nicely all things considered. Making good time too, I just got one from pad to rdg and we were early at almost every stop - notably from Ealing to Southall, did it in 4 mins of the booked 9. I'm guessing these timings are still a bit liberal though at the moment?

I think its the same situation the 800s are in. The current timetable is built for the diesels which have much poorer acceleration. While under wires the electrics are basically always ahead. The upcoming big new schedule will probably change that to take better advantage of the electric acceleration.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
37800 & 387160
Ah ok, thought I was right with the 387 as I glanced on way past, and thought I saw "Cassiopeia" on the side of the 37, wondered which one it could be but turns out 800 just got named in the last couple of weeks.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
Apparently 12 car 387s are doing some Didcot locals in the evening peaks, getting delayed at Maidenhead why commuters to the 5 coach walk of shame and then wait at Reading 10-30 minutes why they try to remove the rear unit.

Whats going on? The commuters are not happy bunnies anymore with the new trains!
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Apparently 12 car 387s are doing some Didcot locals in the evening peaks, getting delayed at Maidenhead why commuters to the 5 coach walk of shame and then wait at Reading 10-30 minutes why they try to remove the rear unit.

Whats going on? The commuters are not happy bunnies anymore with the new trains!
I was on 1D93 yesterday, that was a 12. Yes we were at Maidenhead 5 mins, probably was commuters walking down from the back. I'd have shut the doors and left - they should listen to the announcements, they're made often enough!
Reading wasn't too bad, it decoupled OK. Didn't get the path away for a few mins due to congestion, but otherwise alright.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,271
Location
Churn (closed)
I was on 1D93 yesterday, that was a 12. Yes we were at Maidenhead 5 mins, probably was commuters walking down from the back. I'd have shut the doors and left - they should listen to the announcements, they're made often enough!
Reading wasn't too bad, it decoupled OK. Didn't get the path away for a few mins due to congestion, but otherwise alright.

I agree that the announcements are endlessly clear to the point of annoying!

I suppose the commuters used to 2 car 165s have yet to learn that trains longer than 6 coaches are possible! 8 is a shock, but 12 must be so unbelievable to them that they don't believe it!
 
Status
Not open for further replies.

Top