They are running hourly instead of half hourly from D Parkway :(

Amended Saturday timetable with only 2tph west of Reading.
Looks like there's some engineering works or something.
From journey check:
Between London Paddington and Oxford/Didcot Parkway via Maidenhead and Reading

Planned engineering work will take place between London Paddington and Oxford/Didcot Parkway via Maidenhead and Reading from 04:00, Saturday 06 January 2018 to 02:00, Sunday 07 January 2018.
Additional Information
Saturday All day, a revised service will run between London Paddington, Slough, Maidenhead, Reading and Oxford.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dp21

Member
Joined
10 May 2017
Messages
358
Could said engineering work be to do with the issues that the 800s have been experiencing with clashes with the axle counters?
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
8,406
Location
UK
Could said engineering work be to do with the issues that the 800s have been experiencing with clashes with the axle counters?

Most likely, I think everything else would have been done over Xmas
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I thought that the cable had been replaced at some point yesterday. One of the insiders posted to that effect and that the tests all seemed positive.
 

FenMan

Established Member
Joined
13 Oct 2011
Messages
1,538
I had my first ride on a GWR 387 yesterday, from Reading to Maidenhead. As mentioned by others, the onboard ambience is very good and the seats, although hard, encourage you to sit correctly rather than slouch.

I do have one gripe - the ride quality was poor. The train felt very fidgety, to the extent that several interior panels starting vibrating in Voyager fashion. In contrast the ride quality from Reading back to Blackwater on a 166 was dramatically better. I hope this can be fixed by revisiting the damper settings and not something we have to endure for the life of the train.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
I had my first ride on a GWR 387 yesterday, from Reading to Maidenhead. As mentioned by others, the onboard ambience is very good and the seats, although hard, encourage you to sit correctly rather than slouch.

I do have one gripe - the ride quality was poor. The train felt very fidgety, to the extent that several interior panels starting vibrating in Voyager fashion. In contrast the ride quality from Reading back to Blackwater on a 166 was dramatically better. I hope this can be fixed by revisiting the damper settings and not something we have to endure for the life of the train.
Dampers set for 110mph...
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
You can tinker around with dampers all you like, but that can only do so much if the condition of track is less than perfect.

The track on the up relief line east of Reading takes a pounding from the loaded aggregates trains from Westbury. Even between Didcot and Reading, where most of the freight is container trains, there are places where the ride on the reliefs can be 'lively' on an HST at 100mph.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
You can tinker around with dampers all you like, but that can only do so much if the condition of track is less than perfect.

The track on the up relief line east of Reading takes a pounding from the loaded aggregates trains from Westbury. Even between Didcot and Reading, where most of the freight is container trains, there are places where the ride on the reliefs can be 'lively' on an HST at 100mph.
Agreed but the damper set up accentuates the situation.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Might be a bit of an obvious question but I haven't seen anything specifically - is there a link to somewhere detailing which routes will officially use what type of rolling stock by a given date? I'm a bit out of the loop on the Great Western side with the electrification cutbacks regarding what stays as 165/166, what will be 387 or 800/802. I have a fair idea when the 800s will all be introduced and that almost all the 387s are now ready for service, but it's a bit confusing to work out which routes will be served by what moving forward.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
Under currently confirmed electrification plans -

Virtually everything that’s presently an HST will be an 800/802; plus vast majority of Padd - Oxford (and beyond) services and Padd - Bedwyn fast services.

Turbos in the east will be confined to Greenford, Windsor, Marlow and Henley branches; Gatwick Line; Basingstoke; and a half-hourly Didcot-Oxford/Banbury shuttle. Some may turn up on Fast Padd a Oxford services, but plans are for vast majority to be IET operated.

387s will then operate most other Thames Valley services - Padd to Reading/Didcot stopping, semi-fast and fast services; Reading to Newbury stopping services.
 

jimm

Established Member
Joined
6 Apr 2012
Messages
5,276
Under currently confirmed electrification plans -

Virtually everything that’s presently an HST will be an 800/802; plus vast majority of Padd - Oxford (and beyond) services and Padd - Bedwyn fast services.

Turbos in the east will be confined to Greenford, Windsor, Marlow and Henley branches; Gatwick Line; Basingstoke; and a half-hourly Didcot-Oxford/Banbury shuttle. Some may turn up on Fast Padd a Oxford services, but plans are for vast majority to be IET operated.

387s will then operate most other Thames Valley services - Padd to Reading/Didcot stopping, semi-fast and fast services; Reading to Newbury stopping services.

Once the full IET fleet is available, the entire Oxford/Cotswold Line fast service will be provided by 800s and 802s.

The only Cotswold Line Turbo working looking like having a long-term future is the morning stopping train from Worcester to Oxford and Didcot - depending on what the timetable change brings for 2019, the 2-car set for this might do a bit more work on the Cotswold Line, otherwise will presumably be helping the rest of the day on Didcot diesel shuttles.
 

TheAdelante

Member
Joined
14 Nov 2017
Messages
269
I had my first ride on a GWR 387 yesterday, from Reading to Maidenhead. As mentioned by others, the onboard ambience is very good and the seats, although hard, encourage you to sit correctly rather than slouch.

I do have one gripe - the ride quality was poor. The train felt very fidgety, to the extent that several interior panels starting vibrating in Voyager fashion. In contrast the ride quality from Reading back to Blackwater on a 166 was dramatically better. I hope this can be fixed by revisiting the damper settings and not something we have to endure for the life of the train.
What a coincidence, I did 387 bashing on Saturday too and likewise ended the day at Blackwater! I was on the 1804 off Reading though, that was a 165 not a 166.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Under currently confirmed electrification plans -

Virtually everything that’s presently an HST will be an 800/802; plus vast majority of Padd - Oxford (and beyond) services and Padd - Bedwyn fast services.

Turbos in the east will be confined to Greenford, Windsor, Marlow and Henley branches; Gatwick Line; Basingstoke; and a half-hourly Didcot-Oxford/Banbury shuttle. Some may turn up on Fast Padd a Oxford services, but plans are for vast majority to be IET operated.

387s will then operate most other Thames Valley services - Padd to Reading/Didcot stopping, semi-fast and fast services; Reading to Newbury stopping services.
Thanks that's helpful. It just seemed difficult to see why there were so many units (387s) for what seemed rather few routes compared to the 800s.
 

Malcolmffc

Member
Joined
19 Mar 2017
Messages
310
Thanks that's helpful. It just seemed difficult to see why there were so many units (387s) for what seemed rather few routes compared to the 800s.

Don’t forget many of the inner suburban workings will be replaced by Crossrail 345s from 2019
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
Thanks that's helpful. It just seemed difficult to see why there were so many units (387s) for what seemed rather few routes compared to the 800s.

The idea is to deliver a step-change in capacity. 8 car Railway where it was previously 3; 12 where it was previously 5/6. Full benefits won’t be realised until Crossrail takes the lions share of inner Thames Valley services.
 

ATW158Xpress

Member
Joined
6 Dec 2016
Messages
288
Looked in GWR Jouney Check this morning and there’s a 2x3 165/166 standing in for a 8 car 387 on Didcot - Paddington service.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,588
Location
Croydon
Don't really believe that I'm afraid. The Coastway is designed for three car units and the 387's 110mph capability would be wasted on the stopping services. Could be good for some GN passengers though...

The only way the GN 387s might get to Southern is if that caused a cascade of the 377/3 (i.e. 3-car) onto the coastway line, thus dispensing with 313s. But that really is conjecture - just as likely the 387s would go into er store.

We really do need some more electric routes don't we !.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,033
Location
81D & 81E
Seems surprising that availability is that tight - what proportion of the fleet is now accepted for into traffic?

Still waiting for two to arrive (160 & 174). I’ll plead the fifth on anything else and keep my thoughts to myself.
 

dp21

Member
Joined
10 May 2017
Messages
358
3rd Rail Cam Light

It's a track-facing camera for track monitoring much like the pan-cams. They're used on all later-build E*s as the 379s have them too and they're 25kV units.

From experience they're quite handy too as sometimes things aren't picked up from the Forward Facing CCTV appear on them. I've seen footage of a near miss on a level crossing which shows a car immediately in front of the train and you can see the reflection of the unit in the windows of the car however the FFCCTV didn't pick it up!

I can only speak from what I have experienced however they appear to be used more on a more reactionary basis rather than proactively monitoring infrastructure. FFCCTV, however, can and is being used by some operators like c2c in a machine vision context.

Slightly off-piste I know but hopefully sets the scene.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
Over Easter there will still be a half-hourly Paddington - Didcot stopping service, but no extra Paddington - Reading shuttles. This is due to engineering works around Paddington. I just hope these Didcot services are most if not all 387s.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
Over Easter there will still be a half-hourly Paddington - Didcot stopping service, but no extra Paddington - Reading shuttles. This is due to engineering works around Paddington. I just hope these Didcot services are most if not all 387s.

There simply aren't enough Turbos at Reading for the Didcot Parkway services you refer to not to be 387s.

Thinning of service on Good Friday looks like its due to two track railway through Twyford and Maidenhead (reliefs open, mains shut).
 